This form must be completed in order to submit your annual L50S financial reporting.
All sponsors are required to check their committees in myProject (https://development.standards.ieee.org/my-site/manage-committees), to verify and certify that they are correctly reporting the groups under their purview.
Submitter information (This section is required and must be completed) Name E-mail address Telephone number Sponsor (This section is required and must be completed) --- Select the one Sponsor you are reporting on --- AES/EPES - Electrical Power/Energy Systems Panel AES/GA - Gyro Accelerometer Panel AES/GCS - Guidance & Control Systems Panel AES/RS - Radar Systems Panel AES/UWBRC - Ultrawideband Radar Committee APS/A - Antennas APS/P - Propagation BOG/CAG - Corporate Advisory Group BTS/AVTech - Audio and Visual Techniques BTS/RFTech - RF Techniques C/DA - Design Automation C/EASC - Environmental Assessment Standards Committee C/FIPA - Foundation for Intelligent Physical Agents C/IA - Information Assurance C/LM - Local and Metropolitan Area Networks C/LT - Learning Technology C/MSC - Microprocessor Standards Committee C/PA - Portable Applications C/S2ESC - Software & Systems Engineering Standards Committee C/SAB - Standards Activities Board C/SI - Simulation Interoperability C/SS - Storage System C/TT - Test Technology CEDA/C-EDA SC - C-EDA Standards Committee COM/PC - Personal Communications COM/SC - Standards Committee COM/TA&OS - Transmission Access & Optical Systems COM/TRANS - Transmission Systems DEI/SC - Standards Committee EMB/11073 - 11073 Committee EMB/Stds Com - Standards Committee EMC/SDCom - Standards Development Committee IAS/CI - Cement Industry IAS/ES - Energy Systems IAS/I&CPS - Industrial & Commercial Power Systems IAS/PCI - Petroleum & Chemical Industry IAS/PPIC - Pulp & Paper Industry Committee IAS/PSE - Power Systems Engineering IAS/PSP - Power Systems Protection IAS/TBCC - Technical Books Coordinating Committee IM/AI TC8 - Automated Test Systems and Instrumentation IM/ATLAS TC11 - SCC20 (ATLAS) Coordination IM/Con TC5 - Connectors in Measurements IM/DC-LF TC2 - DC-LF Measurement IM/ET TC6 - Emerging Technologies in Measurements IM/F&T TC3 - Frequency and Time IM/HFM TC4 - High Frequency Measurement IM/IM - IEEE Instrumentation and Measurement Society IM/MBM TC25 - Medical and Biological Measurements IM/ST TC9 - Sensor Technology IM/UM TC1 - Measurement Precision, Sensitivity and Noise IM/WM&A TC10 - Waveform Generation Measurement and Analysis MTT/SCC - Standards Coordinating Committee NPS/NI&D - Nuclear Instruments and Detectors NTC/SC - Standards Committee PE/ED&PG - Energy Development & Power Generation PE/EM - Electric Machinery PE/IC - Insulated Conductors PE/NPE - Nuclear Power Engineering PE/PSACE - Power System Analysis, Computing, and Economics Committee PE/PSC - Power System Communications PE/PSIM - Power System Instrumentation and Measurements PE/PSR - Power System Relaying PE/SB - Stationary Batteries Committee PE/SPDHV - Surge Protective Devices/High Voltage PE/SPDLV - Surge Protective Devices/Low Voltage PE/SUB - Substations PE/SWG - Switchgear PE/T&D - Transmission and Distribution PE/TR - Transformers PEL/SC - Standards Committee RAS/SC - Standing Committee for Standards RS/RS - IEEE Reliability SASB/SCC04 - Electrical Insulation SASB/SCC10 - Terms and Definitions SASB/SCC14 - Quantities, Units, and Letter Symbols SASB/SCC18 - National Fire Protection Association Standards SASB/SCC20 - Test and Diagnosis for Electronic Systems SASB/SCC21 - Fuel Cells, Photovoltaics, Dispersed Generation, and Energy Storage SASB/SCC22 - Power Quality SASB/SCC27 - Time and Frequency SASB/SCC31 - Automatic Meter Reading and Energy Management SASB/SCC36 - Utility Communications SASB/SCC38 - Voting System Engineering SASB/SCC39 - International Committee on Electromagnetic Safety SASB/SCC40 - Earth Observation SASB/SCC41 - Dynamic Spectrum Access Networks UFFC/UFFC - IEEE Ultrasonics, Ferroelectrics and Frequency Control VT/ITS - Intelligent Transportation Systems VT/LT - Land Transportation VT/RT - Rail Transit
Select this button to certify and report that none of your groups had financial activity for 2009. If any of your groups had financial activity, you must submit the L50S annual report, and select the next button instead.
Select this button to report financial activity for 2009. Groups reporting financial activity must complete the L50S Annual report: http://standards.ieee.org/resources/financial/L50S/L50SFinancialReport.xls, Please download, complete all mandated sections as per the checklist, save file with identifiable file name, i.e., L50S_C-LM-802.xls or see suggested file names, then upload form to the below section, then submit file. Do not use any spaces or special characters in the filename. Underscore and dash/hyphen is ok.
Select a file to upload (If you have several files, please zip them first then upload.)
Comments (This section is optional)
Note: If you would like to have a copy of this transmission, please print your copy prior to pressing the submit file button.