========================== IEEE P1363 Meeting Summary ========================== March 3 -- 5, 1998 Siemens Boca Raton, FL 1. Decisions on the documents -- Move the section on "output data formats" to Annex G (formats). Annex G will also include materials on ASN.1 syntax. -- Modify DL/ECKAS-DH2 to follow X9.42. -- Allow mix of DL and EC primitives in DL/ECKAS-DH2. -- Have two primitives DH and DHC, where DHC takes as input a flag which identifies whether compatability with DH is desired. If desired, then Kaliski's "k-inverse" method will be used. -- Remove Sections 5.3.2.3 and 5.3.2.4 from the main body and change "shall" in the first sentence of Section 5.3 to "should." -- Move materials on point compression and Section 5.5.4 from main body to Annex G (formats). -- Add to Annex A an overview of EC generation method. -- Merge Annex E (RNG) into Annex D (security considerations). -- Remove Annex F (test vectors) and post test vectors to the P1363 web site. 2. Work schedules for P1363 and P1363a P1363 P1363a ============================================================ Apr another draft call for submissions for Annex D Jun final WG review Jul final body for 30-day internal ballot (last call) Aug ballot-related to MSC submissions Nov review of ballot review of submissions 3. Schedules for upcoming meetings and teleconferences -- April 13, teleconference -- May 19, teleconference -- Jun 29 - July 1 in Boston, Kaliski to host. -- Aug 27 - 28 in Santa Barbara. This is a short meeting after Crypto98. -- November 11--13 (tentative) in Washington DC area, Johnson to host.