October 1999 IEEE P1363 Working Group Meeting Summary D11 had passed by an even larger margin than D9 had, however due to ballot comments, the working group had voted to remove the encoding method "EMSR1" and the signature scheme with message recovery "IFSSR" prior to the meeting. We reviewed the ballot comments on P1363-D11 and agreed on appropriate changes to the draft as well as the ballot response. The group agreed that we should re-circulate the latest version of the P1363 draft in November so that it could be submitted to RevCom by the December 17th deadline for review in January. The working group reviewed the first draft of P1363a for content and structure. The content of the document was approved and a list of requested additional supporting material was created. We agreed to hold a vote at the March meeting to limit the content of P1363a to the material that is sufficiently ready for inclusion at that meeting. We agreed not to include material in P1363a that was not already in the current draft or on the list of requested supporting material. We formalized a schedule for the development and completion of P1363a. The group heard presentations on the security properties of TSH-ESIGN and EPOC, and on NTRU. We discussed the possibility of supporting new projects based on topics such as identification schemes, key validation and new families of public-key cryptosystems. We agreed that the Chair should investigate the formation of a study group for new projects. Jerry Solinas was named Webmaster for the group, replacing Leo Reyzin.