P1394b UTP5 Task Group Meeting Minutes - October 12th 1998 1 Welcome, introductions, apologies Introductions were assumed from the immediately previous session. An apology was received from Alistair Coles. 2 Equalisation D L Chen presented some results of the performance of the receiver equalisation scheme that he had presented at the previous meeting (presentation to be placed on the web site). These results were based on the use of MLT-3 with PRBS encoding. CWS requested that the measurements be repeated using the P1394b NRZ (binary) signalling and the P1394b encoding scheme (which limits the run length). Eric Hannah indicated that he is developing a technique for a combination of pre-emphasis and receive equalisation which he intends to present at the next meeting. 3 Reach requirements The previously tabled motion "To delete the requirement that all receive circuits must work over all lengths of cable up to 100m" was considered. CWS read out an email contribution from Alistair Coles. After a shot discussion the vote was taken. DW reminded the group that of the attendance requirements for voting. For: 1; Against: 11; Abstain: 7. Motion fails. 4 Review of the current specification and open issues 4.1 Equalisation example. It was agreed that it would be good to include an informative example of an adaptive equaliser. D L Chen agreed to check with his company (LSI Logic) as to whether the example he had presented can be incorporated (block diagram and descriptive paragraph). 4.2 Electrical specification Eric Hannah indicated that he is carrying out some simulations which will assist confirming the values which are currently TBD in the specification. His analysis would also cover the jitter budget. CWS agreed to check whether the latest FC knowledge on jitter measurement techniques has been incorporated into the P1394b jitter budget (this applies to all specifications, not just UTP5). CWS requested further contributions on electrical modelling in order to corroborate these values. It was agreed that the electrical specification would not be aligned with the short haul - it would retain the lower launch levels for EMC reasons and the more stringent sensitivity. The current value of BER in the specification was discussed. It was agreed to increase this to 10**-12. 4.3 Testing It was agreed to add the requirement that installed cable plant should be tested according to TIA TSB-67. A final request is made for contributions on testing. If none are forthcoming by the next meeting, then no further testing information will be included in the spec. Present Dao-Long Chen Richard Churchill Michele Dale John Fuller John Glenski Thomas Han Eric Hannah Jerry Hauck Sean Killeen Steven D Martinez Angel Mora Shuji Nagao Yoshikatsu Nima Bill Northey Takayuki Nyu Ozay Oktay Bill Prouty Kevin Ross Kyozo Saito Tetsuya Sato Masood Shariff Michael Shinkarovsky Jim Skidmore Ron Soderstrom Michael Jonas Teener Dave Thompson Satoru Toguchi Colin Whitby-Strevens (chairman) David Wooten -- Colin Whitby-Strevens email: Colin.Whitby-Strevens@st.com STMicroelectronics tel: +44 1454 611500 1000, Aztec West fax: +44 1454 617910 Almondsbury BRISTOL BS32 4SQ UK [ To receive daily digests of this list send the one line message: ] [ "subscribe digest butp5" to requests@zayante.com ]