DOCUMENT  LIST  for the  YEAR  2002

Updated  January 2, 2003
COLOR GUIDE  Click here for documents:
Document Number Requested 
(no document received)
Submitted and received documents
Link to Specific Document on the WEB

Doc_

number

Sub_

group

Title

02/601

RRM-SG Control (Simon Barber, Instant802 Networks)

02/602

RRM-SG Wherefore art thou, Control (Darwin Edger, Richard Paine)

02/603

RRM-SG Normative text for the RRM scope for the PAR (Dayrl Kaiser, Cisco Systems)

02/604

E Normative text for TGe Consensus Proposal (Shrini Kandella, Sharp et al)

02/604r1

E Normative text for TGe Consensus Proposal (Shrini Kandella, Sharp et al)

02/605

WNG WNG Monterey Minutes (Garth Hillman (AMD))

02/606

WIG WIG Monterey Minutes (Garth Hillman (AMD))

02/607

HT-SG HT-HG Monterey Minutes (Garth Hillman (AMD))

02/608

W RRM-SG Closing Report for Sept 2002 (Richard Paine, Boeing)

02/609

W Liasion Repoort for 802.15 for closing Plenare Sept 2002 (Mike Seals, Intersil)

02/610

W TGi Final Report for September 2002 Session (David Halasz, Cisco)

02/611

I Clarified CCM Diagrams (David Johnston)

02/611A

I Clarified CCM Diagrams (David Johnston)

02/612

E Normative-Text-For-Tge-Consensus-Proposal (Srinivas Kandala, Sharp, et.al )

02/613

G Dynamic BSS Condition (Matthewr Fischer, Broadcom)

02/614

G Fixing the locked legacy slot condition (Matthewr Fischer, Broadcom)

02/615

W IEEE 802.11 TGg Closing Report (Matthew Shoemake, Texas Instruments)

02/616

W Liaison Report JEDEC JC-61 (Benno Ritter, Philips)

02/617

W September 2002 IEEE P1394.1 Liaison Report (Peter Johansson, Congruent Software, Inc.)

02/618

RRM-SG RRM Requirements Discussion on CCA (Bobby Jose )

02/619

W September 2002 WECA Liasion Report (Sheung LI, Bill Carney)

02/620

E Should Parameterized QoS be Optional (Matthew Sherman, AT&T)

02/620r1

E Should Parameterized QoS be Optional (Matthew Sherman, AT&T)

02/621

H Forward Compatibility Hooks for 802-11h (Lior Ophir, Texas Instruments Inc)

02/622

E WME Fast Track Differences (Adrian Stephens (Intel))

02/623

H Forward Compatibility Hooks for 802-11h Part2 (Lior Ophir, Texas Instruments Inc)

02/624

W TGh Closing Report for the Septeber 2002 Session (Mika Kasslin, Nokia)

02/625r1

E Fast Track Proposed Draft Normative Texr Changes (Amjad Soomro, Philips, et.al.)

02/626

W 802-16 Liaison Report September 2002 (Mika Kasslin, Nokia)

02/627

W Liasion with CableLabs September 2002 Session Update (Lior Ophir, Texas Instruments Inc)

02/627r1

W Liasion with CableLabs September 2002 Session Update (Lior Ophir, Texas Instruments Inc)

02/628r1

W Working Group Agenda for November 2002 Session Kauai, HI (Stuart Kerry, IEEE802.11 Working Group Chair, Philips)

02/628r2

W Working Group Agenda for November 2002 Session Kauai, HI (Stuart Kerry, IEEE802.11 Working Group Chair, Philips)

02/628r3

W Working Group Agenda for November 2002 Session Kauai, HI (Stuart Kerry, IEEE802.11 Working Group Chair, Philips)

02/628r4

W Working Group Agenda for November 2002 Session Kauai, HI (Stuart Kerry, IEEE802.11 Working Group Chair, Philips)

02/629

I TGi Monterey Interim Meeting Minutes - September 2002 (Frank Ciotti, LinCom Wireless)

02/630

RRM-SG Overview-of-Cisco-Per-Client-Extensions-to-802.11-MIB (Daryl Kaiser (Cisco Systems))

02/631

E TGe Closing Report - Monterey 091302 (John Fakatselis, Intersil)

02/632

RRM-SG Minutes for Radio Resource Measurement Study Group for the September 2002 Interium Session (H. Worstell, AT&T, Simon Barber, Instant802 Networks, Richard Paine, Boeing

02/633

RRM-SG RRM Agenda for the September 25, 2002 Teleconference (Richard Paine, Boeing)

02/634

E Simultaneous Registration of 802.11 and Mobile IP v4 (Subrata Goswami, Ph.D., Independent Consultant)

02/635

I Use of Diamter Mobile IPv4 Application for Authentication and Key-Exchange (Subrata Goswami, Ph.D., Independent Consultant)

02/636

E Scrambler Mismatch and MAC FEC: Is there a problem?" (Monisha Ghosh, Vasanth Gaddam, Philips)

02/637

RRM-SG RRM Agenda for October 3, 2002 Teleconference (Richard Paine, Boeing)

02/638

I Support of the Contention Free Period in TGi (Mike Moreton, Synad Technologies)

02/639

I The NoAck Problem (Mike Moreton, Synad Technologies)

02/640

RRM-SG Guidelines for Radio Resource Measurements (Harry Worstell, AT&T)

02/641

RRM-SG RRM Teleconference Minutes for Sept-Oct-Nov. (Richard Paine, Boeing, Harry Worstell, AT&T)
02/642 W Letter Ballot #45 Results (Matthew Shoemake, TI)

02/643

I Tx RX Pseudo Code (David Johnston, Mobilian)

02/643A

I Tx RX Pseudo Code (David Johnston, Mobilian)

02/643r2A

I Tx RX Pseudo Code (David Johnston, Mobilian)

02/644

I TGi Herndon VA Meeting Minutes - October 2002 (Frank Ciotti, LinCom Wireless)

02/645r1

I TKIP Replay Protection Rules (Tim Moore, Microsoft)

02/645r2

I TKIP Replay Protection Rules (Tim Moore, Microsoft)

02/645r3

I TKIP Replay Protection Rules (Tim Moore, Microsoft)

02/646

I AES EAPOL-Key Format (Tim Moore, Microsoft)

02/647r1

I Proposed PICS for 802.11i (David Halasz, Cisco Systems, Inc)

02/648

I Proposed edits to clause 11 for 802.11i (David Halasz, Cisco Systems, Inc)

02/649

E TGe Teleconference summary for resolving Ballot Comments (Srinivas Kandala, Sharp Labs)

02/649r1

E TGe Teleconference summary for resolving Ballot Comments (Srinivas Kandala, Sharp Labs)

02/649r2

E TGe Teleconference summary for resolving Ballot Comments (Srinivas Kandala, Sharp Labs)

02/650

E Assorted Fixes & Normative Text for Known Issues with TSPEC & Signaling (John M. Kowalski, Sharp Labs)

02/650A

E Assorted Fixes & Normative Text for Known Issues with TSPEC & Signaling (John M. Kowalski, Sharp Labs)

 

Status

                   

Subgroup

.

                       

File_format

 .

C

Document Not fit for distribution (Corrected version to be sent to Chair)

A

Task Group a

EX7

Microsoft Excel, V7.0

F

Document number is available

B

Task Group b

PDF

Adobe Acrobat Portable Document Format

M

Mailed

C

Cross boundary group

PPT4

Microsoft PowerPoint, V4.0

N

Document Not received from Author

D

Specification for Operation in Additional Regulatory Domains Task Group d

PPT7

Microsoft PowerPoint, V7.0

V

Document Not fit for distribution (Void)

E

QoS MAC Enhancements Task Group e

PS

Postscript File

X

Document Not distributed in mailing yet

F

IAPP Task Group f

WFW6

Microsoft Word for Windows, V6.0

.

.

I

Security

Enhancements

WFW7

Microsoft Word for Windows, V7.0

.

.

M

Maintenance

.

.

.

.

S

Study group

.

.

.

.

W

Full working group

.

.

.

.

.

.

.

..