OFFICIAL IEEE 802.11 WORKING GROUP PROJECT TIMELINES - 07/02/08

 Historical Ballot Timeline

IN PROCESS  - Standards, Amendments, and Recommended Practices

IEEE Project and Final Document

Final Doc Type

Project Authorization Request (PAR)

Task Group and Activity

Documentation Current Status

PAR Approved, Modified, or  Extended

[Expires]

WG Letter Ballots (LBs)

Form Sponsor Ballot (SB) Pool / Reform

MEC Done

IEEE-SA Sponsor Ballots (SBs)

Final 802.11 WG Approval

Final or (Conditional) 802 EC Approval

RevCom & Standards Board Final or Continuous Process  Approval

ANSI Approved

Superseded or Withdrawn by Standards Board
Session End Snapshot

Initial

Recirculation

Initial

Recirculation

Format & Version Incorporated Baselines

Draft

Date

Draft

Date

Draft

Date

Draft

Date

IEEE Std 802.11aa-xxxx

A

Video Transport Streams

TGaa

None

11-2007

Actual

xx/03/08

                         

 

 

Predicted

C

Nov-09

Mar-10

Jun-10

Jul-10

Sep-10

Jan-11

Mar-09

Mar-09

May-11

N/A N/A

IEEE Std 802.11z-xxxx

A

Extensions to Direct Link Setup

TGz

Word/PDF

D1.0

11-2007

Actual

08/22/07

[12/31/11]

                         

 

 

Predicted

C

Mar-08

Sep-08

Dec-08

Mar-09

Mar-09

May-09

Jul-09

Jul-09

Sep-09

N/A N/A

IEEE Std 802.11y-xxxx

A

3650-3700 MHz Operation in USA

TGy

Frame/PDF

D10.0

11-2007

Actual

03/16/06

[12/31/10]

 D1.0

12/08/06

D2.0

04/19/07

06/20/07

07/28/07

 D7.0

12/21/07

 D8.0

02/27/08

07/18/08

07/18/08
(Conditional)

09/26/08

 

 

 11k D13.0

D3.0

06/05/07

 D9.0

03/12/08

11r D9.0

D4.0

08/06/07

 D10.0

04/03/08
D5.0 09/28/07 D11.0 06/05/08
D6.0 11/23/07

Predicted

C

C C C C C C C C Jun-08

N/A

N/A

IEEE Std 802.11w-xxxx

A

Protected Management Frames

TGw

Frame/PDF

D6.0

11-2007

Actual

03/20/05

[12/31/09]

 D1.0

10/10/06

 D2.0

04/18/07

11/13/07

 

 

 

 

 

 

 

 

 

11k D8.0

 D3.0

10/04/07

11r D7.0

 D4.0

12/12/07

11n D2.07

 D5.0

02/05/08

11y D4.0

Predicted

C

C

C

C

Jul-08

Jul-08

Sep-08

Mar-09

Mar-09