Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802.3_100GNGOPTX] FYI... +++ 802.3 WG 1st RECIRCULATION BALLOT: IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables D2.1 ballot



Dear Task Force Participants,

Our draft D2.1 is now in recirculation ballot.

Many thanks to Pete Anslow for his diligent work as Chief Editor, and for the work of our clause editors Jonathan King, Ryan Latchman and Peter Stassar. Thanks also to those who have read, voted, and contributed to the development of this specification. Your continued efforts are appreciated.

Regards,

Dan Dove
Chair, IEEE P802.3bm 40 Gb/s and 100 Gb/s Optical Task Force


-------- Original Message --------
Subject: [STDS-802-3] +++ 802.3 WG 1st RECIRCULATION BALLOT: IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables D2.1 ballot
Date: Fri, 7 Feb 2014 11:51:43 +0000
From: Law, David <dlaw@xxxxxx>
Reply-To: Law, David <dlaw@xxxxxx>
To: STDS-802-3@xxxxxxxxxxxxxxxxx

Dear Colleagues:

This is the announcement of the electronic IEEE 802.3 Working Group 1st recirculation ballot on the amendment IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables. Remember that voting, as well as attendance, is a requirement to maintain your IEEE 802.3 member (voter) status. Instructions for accessing the draft, casting your ballot and submitting comments follow this announcement. The ballot group for this draft is the IEEE 802.3 voting membership as of Friday 15th November 2013.

Because this is a recirculation ballot, YOU ONLY NEED TO CAST A BALLOT IF YOU WISH TO CHANGE YOUR VOTE FROM THAT WHICH WAS RECORDED ON THE INITIAL BALLOT OR LAST RECIRCULATION. If you voted previously and your vote has not changed, the last ballot cast will be carried over to this ballot and you do not need to cast a new ballot.

BALLOT SCOPE:
During this IEEE 802.3 Working Group 1st recirculation ballot, the scope of the ballot is the substantive changes between IEEE P802.3bm/D2.1 and IEEE P802.3bm/D2.0 and the unsatisfied negative comments from the initial ballot.

FIVE CRITERIA:
One of the responsibilities as a balloter is to ensure that draft is consistent with the 5 Criteria responses which are available at <http://www.ieee802.org/3/bm/P8023bm_5Criteria_1112.pdf>. An Approve vote indicates your agreement that the draft is consistent with the 5 Criteria responses.

BALLOT OPEN:
Saturday 8 February 2014

BALLOT CLOSE:
Friday 28 February 2014 23:59 AOE

The Project Authorization Request for this amendment is posted at http://www.ieee802.org/3/bm/P802.3bm_May2013.pdf and includes the following:

TITLE:
IEEE Standard for Ethernet Amendment: Physical Layer Specifications and Management Parameters for 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables

SCOPE OF PROJECT:
This project is to specify additions to and appropriate modifications of IEEE Std 802.3 to add 100 Gb/s Physical Layer (PHY) specifications and management parameters, using a four-lane electrical interface for operation on multimode and single-mode fiber optic cables, and to specify optional Energy Efficient Ethernet (EEE) for 40 Gb/s and 100Gb/s operation over fiber optic cables. In addition, to add 40 Gb/s Physical Layer (PHY) specifications and management parameters for operation on extended reach (>10 km) single-mode fiber optic cables.

NEED FOR THE PROJECT:
Rapid growth of server, network, and internet traffic is driving the need for higher data rates, higher density, lower cost fiber optic solutions, especially in the data center space. Advances in technology now allow the specification of new 100 Gb/s Physical Layer types with reduced lane count, addressing these needs. IEEE Std 802.3 does not currently define a 100 Gb/s four-lane electrical interface between host ICs and optical modules, nor does it define an extended reach solution for 40 Gb/s on single-mode fiber beyond 10 km.

Thank you for your participation in this ballot and careful review of the draft.

David Law,
Chair, IEEE 802.3 Ethernet Working Group
Phone: +44 131 665 7264
Email: david_law@xxxxxxxx 

Dan Dove
Chair, IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables Task Force
Phone: +1 530 906 3683
Email: dan_dove@xxxxxxxx

----------------------------------------------------------------

INSTRUCTIONS FOR BALLOTING ON: IEEE P802.3bm draft D2.1

Instructions for accessing the ballot documents, casting your ballot and submitting comments follow.

HOW TO ACCESS THE DRAFT
The draft is posted for your review for balloting purposes only, and neither the draft nor access information should be copied or redistributed to others in violation of document copyrights.

The IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables draft D2.1 may be downloaded from:

http://www.ieee802.org/3/bm/private/P802d3bm-D2p1.pdf 
Username: xxxxxxxx
Password: xxxxxxxx (removed for P802.3bm reflector)

Please submit comments against the above draft.

A comparison file between IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables draft D2.0 and D2.1 is also provided to both focus and ease your review. Please DO NOT comment on this comparison document. This draft may be downloaded from:

http://www.ieee802.org/3/bm/private/P802d3bm-D2p1_CMP.pdf

Please DO NOT submit comments against the above document.

Unsatisfied negative comments, and their dispositions, from the initial ballot may be downloaded from:

http://www.ieee802.org/3/bm/comments/P802d3bm_D2p0_unsatisfied_Cl.pdf

All comments, and their dispositions, from the initial ballot may be downloaded from:

http://www.ieee802.org/3/bm/comments/P802d3bm_D2p0_comments_final_Cl.pdf 

These documents are posted in Adobe "pdf" document format and can be downloaded and printed if desired. If you do not have Adobe Acrobat Reader, it may be downloaded for free downloading from Adobe from:

http://www.adobe.com/prodindex/acrobat/readstep.html 


HOW TO CAST YOUR BALLOT

To assure your ballot is counted, please:

1) Send your ballot to: stds-802-3-ballot@xxxxxxxx

2) Paste the following line into the subject field:

IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables D2.1 ballot

This can be done with this link <mailto:stds-802-3-ballot@xxxxxxxx?subject=IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables D2.1 ballot>


3) Paste into the message body and complete the ballot form below:


-----CUT AND PASTE TEXT BELOW THIS LINE ONLY PLEASE--------

IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables D2.1 ballot


Your Name:___________________________

 
 ___ APPROVE ALL WITHOUT COMMENT

 ___ APPROVE ALL WITH COMMENTS on SOME
       (All comments are non-binding)

 ___ DISAPPROVE
       (Some or all comments are binding; a voter must attach specific comments for remedy)

 ___ ABSTAIN, Lack of Expertise

 ___ ABSTAIN, Lack of Time

 
-----------------------end ballot form--------------------

HOW TO SUBMIT COMMENTS

Acceptable comment types:

E = Editorial
ER = Editorial Required (a binding comment that is part of a DISAPPROVE vote, therefore only appropriate for an IEEE 802.3 voting member)
T = Technical
TR = Technical Required (a binding comment that is part of a DISAPPROVE vote, therefore only appropriate for an IEEE 802.3 voting member)

1. Prepare your comments in one of the following two ways:

a. You are STRONGLY REQUESTED to use the comment tool at the URL:

http://www.ieee802.org/3/WG_tools/filemaker/Generic_Commenting_Tool.zip

To use the tool, extract all components into a folder and do not move any component from that folder as this will cause the executable to not work correctly. The tool is:

Comment_Tool_Generic_Solution.exe

b. To submit comments in text (ASCII) form, please use the form below. This will make it possible for the editor to properly record and track all submissions. Make as many copies of the template as necessary and submit as an ASCII text file or as part of your e-mail.

PLEASE NOTE: The ASCII method involves a manual transcription, hence you are recommended to check your comments to ensure accurate transcription when the comment file is made available. Please use the comment tool above if possible.

 ------CUT AND PASTE TEXT BELOW THIS LINE ONLY PLEASE--------

CommentID: (Leave Blank)
CommenterName:
CommenterEmail:
CommenterPhone:
CommenterCellPhone:
CommenterCompany:
Clause:
Subclause:
Page:
Line:
CommentType: (E, ER, T, or TR)
Comment:
CommentEnd:
SuggestedRemedy:
RemedyEnd:

--------------------end comment template------------------

2. Send your comments to: stds-802-3-ballot@xxxxxxxx and paste into the subject line:

IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables D2.1 comments

This can be done with this link <mailto:stds-802-3-ballot@xxxxxxxx?subject=IEEE P802.3bm 40 Gb/s and 100 Gb/s Operation Over Fiber Optic Cables D2.1 comments>