Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Subject: Survey of lengths of installed optical fiber cable



 
Please find below a request issued September 29, 1999 from Geoff Thompson
(Chair IEEE 802.3) requesting that the IEEE 802.3 members respond to a survey
designed to characterize the lengths and types of installed optical fiber cable.
 
Based on the response to that request, and the importance of the information
to the development of the higher speed 802.3 standard (10 Gb/s), the survey
response is requested once more.
 
Your participation is greatly appreciated. The goal is to present the survey results at the IEEE
plenary meeting scheduled for the week of 6 March Albuquerque.
 
To meet that deadline, the survey response is required by February 25 th.
Forward completed surveys to Chris Di Minico, Mohawk/CDT (cd@mohawk-cdt.com).
All lengths are to be reported in meters.
 
The survey documentation is located on the 802.3 web site at the following URLs.
 
Cover_letter.doc
 
Survey document: All lengths are to be reported in meters.
http://grouper.ieee.org/groups/802/3/10G_study/public/cabling_adhoc/public/
HSSG_survey.doc
 
 
 
-------------------------------------------------------------------------------------------------------------------------------
The following email is sent on behalf of Goeff Thompson, Chair of 802.3 by the
HSSG Fiber Survey Ad Hoc:

                                                                                      September 27, 1999
 
To: IEEE 802.3 Members
From: Geoff Thompson, Chair IEEE 802.3
Subject: Survey of lengths of installed optical fiber cable
 
Characterization of the lengths and types of installed optical fiber cable is an item of critical
importance to the development of the higher speed 802.3 standard (~10 Gb/s). The attached
survey is designed to capture the information necessary to determine the installed cabling lengths
 in order to specify appropriate physical layer specifications for the higher speed standard.
 
We are requesting that each 802.3 member ask a network manager  in his/her own company
(on a coordinated basis that results in one response per company) to fill in the following
attached survey.
 
For 802.3 members who are employees of network equipment vendors, we ask in
addition that you request that one or more of your customers take the time to fill in the survey.
 
Criteria for participation:

+ OTDR length data on installed links (or equivalent detailed data e.g., where the
   lengths had been recorded from the cable length marks).
 
+ A minimum of 500 network nodes
 
Your participation is greatly appreciated. The goal is to present the survey results at our
 next plenary meeting which is scheduled for the week of 8 November in Hawaii.
 
 
To meet that deadline, the survey response is required by October 29th.
Forward completed surveys to Chris Di Minico, Mohawk/CDT (cd@mohawk-cdt.com).
 
The survey documentation is located on the 802.3 web site at the following URLs.
 
Cover_letter.doc
 
 
Best Regards,
 
Geoff Thompson (geoff_thompso@baynetworks.com), Chair IEEE
802.3