| Organizational materials | ||||
|---|---|---|---|---|
| All contributions (zipped, version 4) | 15.3MB | Marek Hajduczenia | ZTE Corporation | |
| Opening SG report | 1.8MB | Marek Hajduczenia | ZTE Corporation | |
| Opening WG report | 428kB | Marek Hajduczenia | ZTE Corporation | |
| Closing WG report | 1.05MB | Marek Hajduczenia | ZTE Corporation | |
| Meeting minutes (unapproved) | 103kB | Alan Brown | Aurora Networks | |
| Meeting minutes (approved 2012.01.27) | 103kB | Alan Brown | Aurora Networks | |
| Approved project objectives | 353kB | ExEPON Study Group | ||
| Approved project PAR | 179kB | ExEPON Study Group | ||
| Approved 5 Criteria for the project | 507kB | ExEPON Study Group | ||
| Closing motions for PAR, SG extension and editorial license for the Chair | 196kB | ExEPON Study Group | ||
| Technical contributions | ||||
| Title | Size | Author(s) | Affiliation | |
| Cost Comparison of the 10G-EPON PMDs | 170kB | David Li | Hisense-Ligent | |
| Target Specifications of Extended 10G-EPON PMDs | 152kB | David Li | Hisense-Ligent | |
| Proposal for Extended EPON PMD | 2.3MB | Jidong Xu | ZTE Corporation | |
| PAR & 5 Criteria ontributions | ||||
| Title | Size | Author(s) | Affiliation | |
| 5 Criteria: Distinct Identity | 290kB | Marek Hajduczenia | ZTE Corporation | |
| 5 Criteria: Market Potential | 1.6MB | Ed Mallette | BrightHouse Networks | |
| 5 Criteria: Technical Feasibility | 243kB | David Li | Hisense-Ligent | |
| 5 Criteria: Economic Feasibility | 243kB | David Piehler | Neophotonics | |
| 5 Criteria: Compatibility | 465kB | Marek Hajduczenia | ZTE Corporation | |
| Proposed objectives for the project | 210kB | Marek Hajduczenia | ZTE Corporation | |
| Proposed responses to PAR questions | 728kB | Marek Hajduczenia | ZTE Corporation | |
| Technical contributions (post-deadline, from the floor) | ||||
| Title | Size | Author(s) | Affiliation | |
| 10G EDC For Extended Reach in SMF: Both Down- & Up-stream | 642kB | Frank ChangDavid Li | VitesseHisense-Ligent | |
| project objectives ... how far, how long ... | 797kB | Marek Hajduczenia | ZTE Corporation | |
| Notes on EPON extender boxes and EPON PMDs | 1.7MB | David Piehler | Neophotonics | |
| 5 Criteria: Market Potential (revision a) | 1.2MB | Ed Mallette | BrightHouse Networks | |
| Proposal for Extended EPON PMD(revision with technical changes) | 2.3MB | Jidong Xu | ZTE Corporation | |
|
|
|
|