SG, TF or WG

Mon

Tue

Wed

Thu

Fri

 

Room

Contact

P802.3bt 4-Pair Power over Ethernet Task Force 

08h00-17h00 

08h00-17h00 

08h00-17h00 

Room 18

CICG

 

Chad Jones

 802.3 Maintenance Task Force

 

11h00-18h00 

 

Room 14

CICG

 

Adam Healey

P802.3ca 25 Gb/s, 50 Gb/s and 100 Gb/s EPON Task Force

 

08h00-18h00

08h00-18h00

08h00-18h00

 

Room

CICG

14à15

Note 1

 

Curtis Knittle

P802.3cb 2.5 Gb/s and 5 Gb/s Operation over Backplane and Copper Task Force

 

 

08h00-11h00

 

 

Room 12

CICG

 

Dan Smith

P802.3cd 50 Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force

08h00-18h00 

08h00-18h00 

08h00-12h00

 

 

C2

ITU

Mark Nowell

P802.3cd Track 1

08h00-18h00

08h00-12h00 Note 1

 

 

 

Room 15

CICG

 

 

P802.3.2 (P802.3cf) YANG Data Model Definitions Task Force

08h00-18h00

 

 

 

 

Room 14

CICG

 

Yan Zhuang

P802.3cg 10Mb/s Single Pair Ethernet PHY Task Force

IEEE 802.3 10 Mb/s Backplane Ethernet Study Group

08h00-18h00

 

 

 

 

 

08h00-14h00

08h00-18h00

08h00-18h00

 

 

 

 

 

16h00-18h00

 

 

C1

ITU

 

George Zimmerman

 

 

 

 

 

Jon Lewis

P802.3ch Multi-Gig Automotive Ethernet PHY Task Force

 

 

 

09h00-18h00

09h00-18h00

Room 15

CICG

 

Steve Carlson

 IEEE 802.3 Ethernet Working Group

 

 

 

 19h00-21h00

 

C1 + C2

ITU

David Law

 IEEE 802.3 Beyond 10 km Optical PHYs Study Group

 

 

13h00-20h00

08h00-12h00

 

C2

ITU

John D'Ambrosia

 IEEE 802.3 100 Gb/s per Lane Electrical Study Group

 

 

 

13h00-17h30

08h00-18h00

C2

ITU

Beth Kochuparambil

 IEEE 802.3 Next-generation 200 Gb/s and 400 Gb/s MMF PHYs Study Group

08h00-18h00

08h00-18h00

 

 

 

Room 18 CICG

 

Robert Lingle

NEA - Switch Latency in Industrial Networks

 

 

18h00-19h30

 

 

ITU Tower Room A

 

John D'Ambrosia

NEA

 

 

 

 

09h00-18h00

C1

ITU

John D'Ambrosia

Isolation Ad Hoc

 

19h00-20h00

 

 

 

ITU Tower Room A

 

Jon Lewis

CICG rooms are available between 08h00 and 18h00 only

Note 1: P802.3ca will move to CICG Room 15 as soon as P802.3cd Track 1 finishes on Tuesday and will remain in CICG Room 15 Wednesday and Thursday

P802.3cg and IEEE 802.3 10 Mb/s Backplane Ethernet Study Group will co-locate. Start and stop times are best-guess estimates for the SG.