Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802.3af] Port power supply requirements Tables 5 and 10 in Draft 1.2




Hi to all,

Attached is a link to the revised Table 5,10 as presented in Portsmouth and
include the changes made on line with the group.
Please read and comment on it over the reflector.
My target is that within two weeks from today I will update the document
according to your comments and send it to Mike as an update to be included
in his new draft.

Regards

Yair.

http://grouper.ieee.org/groups/802/3/af/public/sep01/darshan_2_0901.pdf

Darshan Yair
Chief   Engineer 
> PowerDsine Ltd.  -  Powering Converged Networks
> 1 Hanagar St., P.O. Box 7220
> Neve Ne'eman Industrial Zone
> Hod Hasharon 45421, Israel
Tel:  +972-9-775-5100, Ext. 210. Cell: +972-54-893019
Fax: +972-9-775-5150
> E-mail: <mailto:yaird@powerdsine.com>.    
> http://www.powerdsine.com
> 
> 
>