![]() Chair: R. W. Benjamin Stell, P.E. PB Transit & Rail Systems Ph: 1 (617) 960-4842 Fax: 1 (617) 482-8487 |
![]() Vice-Chair: Steve Bezner, P.E. Burns Engineering Ph: 1 (301) 577-6676 Fax: 1 (301) 577-2088 |
Status: The PAR has been approved. The WG is proceeding to develop the draft standard. Upcoming Meetings: Meetings are currently being held as break-out session of the Traction Power Substation Subcommittee. Draft Standard Minutes Members |
| Scope: This standard covers design, manufacturing, and testing unique to application of uncontrolled semiconductor power rectifiers for dc supplied transportation substation applications up to 1500 volts dc nominal output. |
Purpose: At the present time there are no suitable standards governing requirements for traction power rectifiers. This standard will provide requirements specific to traction power rectifiers supplying power to dc supplied transportation equipment. |
Home Page: http://grouper.ieee.org/groups/railtransit
Modified - 01 October 2007