John Sheppard writes:
I believe
there is a mixture here. First, as mentioned, we have an approved architecture
PAR and are about to get another PAR for test results. We have a draft for the
diagnostics schema being worked under the current P1232a PAR and a draft for
the test results schema. There is also a draft common schema, but I think
there is considerable work to be done yet on that. Then there are other
projects that have not really gotten off the ground. Since there are existing
PARs and drafts, it seems silly to me to have technical work done outside of
the SDO responsible.
I would agree, now
that I see the entire picture. No need, except perhaps for a technical
conference after the standard is approved.
Thanks,
John.
Dave
Barton
EDAptive
Computing
|