IEEE SCC21
IEEE HomeSearch IEEE ShopWeb Account Contact IEEE IEEE
MembershipPublicationsServicesStandardsConferencesCareers/Jobs
IEEE-SA IEEE-SA Member Area Search our standards database for Abstract, Sponsor, Status, Contact,Ordering and Historical information. IEEE-SA Standards Association

SCC21

SCC21 Activities
and Projects
2030 Smart Grid Series
  2030TM
  P2030.1TM
  P2030.2TM
  P2030.3TM
1547 Interconnection Series
  1547TM
  1547.1TM
  1547.2TM
  1547.3 TM
  1547.4TM
  P1547.5TM
1547.6TM
P1547.7TM
P1547.8TM
Photovoltaics
937TM
1013TM
1361TM
1526TM
1561TM
1562TM
1661TM
SCC21 Resources
Site Map

IEEE P1547.5 Draft Technical Guidelines for Interconnection of Electric Power Sources Greater than 10MVA to the Power Transmission Grid - Withdrawn 12/2011


Scope

This document provides guidelines regarding the technical requirements, including design, construction, commissioning acceptance testing and maintenance/performance requirements, for interconnecting dispatchable electric power sources with a capacity of more than 10 MVA to a bulk power transmission grid.

Purpose

The purpose of this project is to provide technical information and guidance to all parties involved in the interconection of dispatchable electric power sources to a transmission grid about the various considerations needed to be evaluated for establishing acceptable parameters such that the interconnection is technically correct.






















  (Last modified 03/15/12 Komomua)