IEEE Navigational Bar IEEE HomeSearch IEEEJoin IEEEAbout IEEE
IEEE Standards Navigation Bar Search IEEE-SAIEEE-SA Home

SCC21

SCC21 Activities
and Projects
Smart Grid Standards
  P2030TM
TF1
TF2
TF3
1547 Series
  1547TM
  1547.1TM
  1547.2TM
  1547.3 TM
  P1547.4TM
  P1547.5TM
P1547.6TM
P1547.7TM
Photovoltaics
937TM
1013TM
1361TM
1526TM
1561TM
1562TM
1661TM
SCC21 Resources
Site Map

IEEE P1547.5 Draft Technical Guidelines for Interconnection of Electric Power Sources Greater than 10MVA to the Power Transmission Grid

Welcome to the P1547.5 Work Group (WG) site. The purpose of this site is to facilitate development of the P1547.5 standard while providing external communication of our progress.

Contact the P1547.5 chair, M. N. Satyanarayan, for more about this standard or Tom Basso, SCC21 secretary, for additional information about the 1547 series of interconnection standards.


Scope

This document provides guidelines regarding the technical requirements, including design, construction, commissioning acceptance testing and maintenance/performance requirements, for interconnecting dispatchable electric power sources with a capacity of more than 10 MVA to a bulk power transmission grid.

Purpose

The purpose of this project is to provide technical information and guidance to all parties involved in the interconection of dispatchable electric power sources to a transmission grid about the various considerations needed to be evaluated for establishing acceptable parameters such that the interconnection is technically correct.


Officers

Chair
M. N. Satyanarayan
M.N. Satyanarayan

Standards Liasion
Bill Ash
IEEE
445 Hoes Lane
Piscataway, NJ 08845
732 465 5828 (phone)

Vice Chair
Steven Barnes
General Electric Company
One River Road, Bldg. 2-620
Schenectady, NY 12345
518-385-0505 (phone)
  (Last modified 6/15/09 Komomua)

IEEE-SA Home   Webmaster
Copyright © 2008 IEEE
e.yearwood@ieee.org