IEEE P1547.5 Draft Technical Guidelines for Interconnection of Electric Power Sources Greater than 10MVA to the Power Transmission Grid - Withdrawn 12/2011
Scope
This document provides guidelines regarding the technical requirements, including design, construction, commissioning acceptance testing and maintenance/performance requirements, for interconnecting dispatchable electric power sources with a capacity of more than 10 MVA to a bulk power transmission grid.
Purpose
The purpose of this project is to provide technical information and guidance to all parties involved in the interconection of dispatchable electric power sources to a transmission grid about the various considerations needed to be evaluated for establishing acceptable parameters such that the interconnection is technically correct.