SCC21
   SCC21 Resources
   SCC21 Activities and Projects


2030 Smart Grid Series
   2030TM
   P2030.1TM
   P2030.2TM
   P2030.3TM


1547 Interconnection Series
   1547TM
   P1547 (full revision)TM
   P1547aTM
   1547.1TM
   P1547.1aTM
   1547.2TM
   1547.3TM
   1547.4TM
   1547.5TM
   1547.6TM
   P1547.7TM
   P1547.8TM


Photovoltaics
   937TM
   1013TM
   1361TM
   1526TM
   1561TM
   1562TM
   1661TM


Site Map
SCC21 Committee  (password protected)


IEEE 1547.5
Draft Technical Guidelines for Interconnection of Electric Power Sources
Greater than 10MVA to the Power Transmission Grid
- Withdrawn 12/2011

Standard Title :
IEEE 1547.5 Draft Technical Guidelines for Interconnection of Electric Power Sources Greater than 10MVA to the Power Transmission Grid

Scope:
This document provides guidelines regarding the technical requirements, including design, construction, commissioning acceptance testing and maintenance/performance requirements, for interconnecting dispatchable electric power sources with a capacity of more than 10 MVA to a bulk power transmission grid.

Purpose:
The purpose of this project is to provide technical information and guidance to all parties involved in the interconection of dispatchable electric power sources to a transmission grid about the various considerations needed to be evaluated for establishing acceptable parameters such that the interconnection is technically correct.

 

 

 

 

 

 

 

 

 

 

 

 


(Last modified 09/12/2012 Komomua)