IEEE SCC21
IEEE HomeSearch IEEE ShopWeb Account Contact IEEE IEEE
MembershipPublicationsServicesStandardsConferencesCareers/Jobs
IEEE-SA IEEE-SA Member Area Search our standards database for Abstract, Sponsor, Status, Contact,Ordering and Historical information. IEEE-SA Standards Association

SCC21

SCC21 Activities
and Projects
2030 Smart Grid Series
  2030TM
  P2030.1TM
  P2030.2TM
P1547aTM
  P2030.3TM
1547 Interconnection Series
  1547TM
P1547aTM
  1547.1TM
  1547.2TM
  1547.3 TM
  1547.4TM
  P1547.5 TM
  1547.6 TM
P1547.7TM
  P1547.7 Logistics
  P1547.7 WG
(password protected)
P1547.8TM
Photovoltaics
937TM
1013TM
1361TM
1526TM
1561TM
1562TM
1661TM
SCC21 Resources
Site Map

IEEE P1547.7 Draft Guide to Conducting Distribution Impact Studies for Distributed Resource Interconnection

Welcome to the P1547.7 Work Group (WG) site. The purpose of this site is to facilitate development of the P1547.7 standard while providing external communication of our progress.

Visit P1547.7 logistics for information about upcoming meetings and past meeting minutes.

Standard Title

IEEE P1547.7 Draft Guide to Conducting Distribution Impact Studies for Distributed Resource Interconnection


Scope

This guide describes criteria, scope, and extent for engineering studies of the impact on area electric power systems of a distributed resource or aggregate distributed resource interconnected to an area electric power distribution system.

Purpose

The creation of IEEE Std 1547 "IEEE Standard for Interconnecting Distributed Resources with Electric Power Systems" has led to the increased adoption of DR throughout distribution systems. This document describes a methodology for performing engineering studies of the potential impact of a distributed resource interconnected to an area electric power distribution system. Study scope and extent are described as functions of identifiable characteristics of the distributed resource, the area electric power system, and the interconnection. Criteria are described for determining the necessity of impact mitigation.

Establishment of this guide allows distributed resource owners, interconnection contractors, area electric distribution power system owners and operators, and regulatory bodies to have a described methodology for when distribution system impact studies are appropriate, what data is required, how they are performed, and how the study results are evaluated. In the absence of such guidelines, the necessity and extent of DR interconnection impact studies has been widely and inconsistently defined and applied.


Officers

Chair
Robert (Bob) Saint
National Rural Electric Cooperative Association (NRECA)
Mail Code: SS9-204
4301 Wilson Blvd.
Arlington, VA 22203
703 907 5863 (phone)
703 907 5518(fax)

Standards Liasion
Bill Ash
IEEE
445 Hoes Lane
Piscataway, NJ 08845
732 465 5828 (phone)
732 562 1561 (fax)

Secretary
Thomas S. Basso
National Renewable Energy Laboratory (NREL)
1617 Cole Blvd. MS 1614
Golden, CO 80401
303 275 3753 (phone)
303 275 3835 (fax)



  (Last modified 09/12/2012 Komomua)

IEEE-SA Home   Webmaster
Copyright © 2009 IEEE
e.yearwood@ieee.org