Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Reminder: Registration for P1547.8, P2030.2 and P1547.1a meetings Feb 4-7, SCC21



Dear SCC21 P1547 series and P2030.2 Colleagues,
The registration deadline is January 24, 2013 for the P1547.8, P2030.2 and P1547.1a Working Group meetings, to allow planning final logistics and to qualify for the reduced rate    https://iecs.memberclicks.net/index.php?option=com_mc&view=mc&mcid=form_157823
Location:        Embassy Suites Santa Clara - Silicon Valley; 2885 Lakeside Drive; Santa Clara, CA 95054, USA
The registration fee is set at US$275 for registrations on or before 24 January 2014. Late registrations made after this date will be US$500. Cancellations can be made before 27 January 2014 with a US$100 cancellation fee.
The P1547.8 and P2030.2 are targeting to have their respective working group pre-ballot meeting (final face-to-face meeting) before completing draft for IEEE ballot.  The P1547.1a plans to review the new draft test procedures established since December meeting and consider the timeline for completing the P1547.1a Amendment. 
 
By middle of next week, emails for each working group will be sent out providing more information for use onsite (Feb 4-7), e.g., updated drafts. 
Draft Agenda/Timeline:  Combined Meetings 
        - Feb 4, 2014  (Tues 8 am sign in; adjourn 5 pm)
P1547.8 (recommended practices/”how-to”):  establish pre-ballot draft working group recommendations.  
 
        - Feb 5, 2014 (Wed 8 am sign in 5 pm adjourn)
P2030.2 (energy storage systems interoperability): establish pre-ballot draft working group recommendations.  
 
        - Feb 6 -7, 2014 (Thurs. – Fri. sign in 8 am; Thursday end 5 pm and Friday adjourn noon)
P1547.1a Amendment 1 (test procedures)
-------------------  ----------------------------- 
We look forward to your participation.  
Sincerely,
Tom Basso. 
Link to Working Group Website:  http://grouper.ieee.org/groups/scc21/
-------------------  ----------------------------- 
Respectfully, Thomas.Basso@xxxxxxxx 
 
office 303 275-3753;   cell 303 514-0579
Distributed Energy Systems Integration,
http://www.nrel.gov/esi/
Power Systems Engineering Center
National Renewable Energy Laboratory (NREL)
15013 Denver West Pkwy ESIF-200
Golden CO 80401