|
Minutes of
Previous Meetings
See
Transformers Committee Minutes
Fall
2009 SC Agenda:
posted 22Oct2009
Documents
from Spring 2007 Meeting:
Seismic
Qualifications:
posted 5Mar2007
Seismic
Qualification Letter:
posted 5Mar2007
Bushing
Advisory Committee Memo:
posted 5Mar2007
Issues
and Research Related to the Qualification of the Transformer-Bushing
System, by Anshel J. Schiff:
posted 2Mar2007
Spring
2006 - IEC
Bushing Report: 
Seismic
Presentation by Anshell Schiff: 
C57.19.01
Reaffirmation Status: 
C57.19.03
Corragenda 01Status: 
Status
/ Meeting Agenda
Task
Force to revise C57.19.100:
Spring
2009 Agenda:
posted 18Apr2009
Fall
2008 Meeting Minutes:
posted 18Apr2009
C57.19.100
Draft 2 Proposed changes:
posted 18Apr2009
Previous
Mtg. Documents
C57.19.100
Draft 1:
posted 12Oct2007
Draw
Lead and Draw Rod Definitions and Applications:
posted 15Mar2006
Bushing
Replacement:
posted 15Mar2006
Check
list for Ordering Replacement Bushings:
posted 15Mar2006
Guide for Application of Power Apparatus
Bushings (Proposed New Clause 9.3): 
Bushing
Montitors: 
Bushing
Storage: 
Guide for Application of Power Apparatus
Bushings (Proposed revisions to Clause 10.2): 
Bushing
Monitoring System: 
On-Line
Monitoring Using Bushing or CT Capacitor Taps: 
Bushing
Sensors: 
Guidelines on Draw Lead Applications:

Temperature
Calculation for Short-time Load above Bushing Rating: 
Bushing
Repair: 
Mounting angle greater than 20 degrees:

RG
Bushing Doble Testing: 
|