Bushing Subcommittee
Bushing Subcommittee Scope
|
|
|
Chair: Fred E. Elliott Bonneville Power Administration Electrical Services TNE - AMPN/2 PO Box 491 Vancouver, WA 98666-0491 USA Telephone: (360) 418-2607 Fax: (360) 418-2958 Email: feelliott@bpa.gov |
Secretary: Peter Zhao Hydro One Equipment Engineering 483 Bay Street (TCT13-B6), Toronto, Ontario, Canada Phone: (416) 345-5926 Fax: (416) 345-6322 E-Mail: peter.zhao@hydroone.com |
|
Minutes of Previous Meetings See Transformers Committee Minutes Fall
2009 SC Agenda: Documents from Spring 2007 Meeting: Seismic
Qualifications: Seismic
Qualification Letter: Bushing
Advisory Committee Memo: Issues
and Research Related to the Qualification of the Transformer-Bushing
System, by Anshel J. Schiff:
Status / Meeting Agenda Task Force to revise C57.19.100: Spring
2009 Agenda: Fall
2008 Meeting Minutes: C57.19.100
Draft 2 Proposed changes: Previous Mtg. Documents C57.19.100
Draft 1: Draw
Lead and Draw Rod Definitions and Applications: Bushing
Replacement: Check
list for Ordering Replacement Bushings:
Guide for Application of Power Apparatus
Bushings (Proposed New Clause 9.3): Guide for Application of Power Apparatus
Bushings (Proposed revisions to Clause 10.2): On-Line
Monitoring Using Bushing or CT Capacitor Taps: Guidelines on Draw Lead Applications:
Temperature
Calculation for Short-time Load above Bushing Rating: |
|
This page is maintained by: webmaster
Last update: 22-Oct-2009