TRANSFORMERS COMMITTEE

Power Transformers Subcommittee

Power Transformers Subcommittee Scope

  • Study and review power transformers and reactors with particular attention to service requirements of installations in the western United States and Canada.
  • Develop and maintain related standards, recommended practices and guides for such products.
  • Coordinate with other technical committees, groups, societies and associations as required.

Chair:

Tom Lundquist

Lundquist Consulting Services, Inc.

1241 N. Bronco Lane

Gilbert, AZ 85233

U.S.A.

Phone: (480) 225-1670

Fax: 

E-Mail:  Tom.Lundquist@ieee.org

Vice-Chair:

Joe Watson

HICO America

Pittsburgh, PA

USA

Phone: (412) 787-1170 ext. 205

E-Mail: joe_watson@ieee.org

Secretary:

Bill Griesacker

Doble Engineering Company
85 Walnut Street
Watertown, MA  02472  U.S.A
Phone: 412-264-3266
E-Mail: bgriesacker@doble.com

Minutes of Previous Meetings

See Transformers Committee Minutes

Fall 2011 Agenda   Updated 29Oct2011

Working Groups
  • Arc Furnace Transformers WG, Revision of C57.17

  • DPV - Grid Transformers TF, Chair, Hemchandra M. Shertukde

Fall 2011 TF Meeting Minutes  posted 23Nov2011

Fall 2011 Position Paper  posted 23Nov2011, password required to access

TF Assignments  posted 19Apr2009

IEEE Std. 929 Annex E & F  posted 19Apr2009, password required to access

IEC 60076-16 Ed.1 posted 21Mar2011, special password required to access

Section 5.3 

PC57.143 Draft 20  Posted 7Mar2008  password required for access

Changes Since Fall 2007 Meeting  Posted 7Mar2008

  • Control Cabinet WG, New C57.148

PC57.148 Draft 4  password required for access, Posted 20Mar2006

Drawings:  Comparison of Styles  (Excel file)  password required for access

PC57.153 Draft 5 Clause 4 password required for access, posted 13Dec2011 

Draft Guide Comment form D5, Clause 3  posted 13Dec2011 

PC57.153 Draft 5 Clause 9 password required for access, posted 02Dec2011 

Draft Guide Comment form D5, Clause 9  posted 02Dec2011 

PC57.153 Draft 4 password required for access, posted 01Sep2

Draft Guide Comment for D4  posted 01Sep2011 

Outline posted 07Sep2010 

Comments - Section 2.5 through 6 posted 27Sep2010 

Section 6 through 9 and Appendix B password required for access, posted 01Oct

Comments - Section 6 through 9 & Appendix B  posted 27Sep2010

Fall 2010 WG Minutes posted 13Mar2011

Spring 2009 Agenda and Presentation posted 19Apr2009

  • Transformer Tank Rupture and Mitigation WG, PC57.156 - Chair Peter Zhao, Vice-Chair Robert Thompson

PC57.156 Draft 1 password required for access, posted 26Oct2011

F11 TIB Presentation posted 14Nov2011

Fall 2006

Presentation 6: Transformer Rupture HQ Perspective posted 04Dec2006

Presentation 8: Review of IEEE Stds on Topic  posted 04Dec2006

Presentation 9: Sealed Tank  posted 04Dec2006

Spring 2006

Presentation 1: Transformer Rupture Statistics  posted 28Apr2006

Presentation 2: Prevention of Tank Rupture   posted 28Apr2006

Presentation 3: Pressure Relief Devices and Their Use on Transformers  posted 28Apr2006

Presentation 4: Transformer Explosion Prevention  (PowerPoint file) posted 28Apr2006

Presentation 5: Natural Ester Based Fluid Evaluation   posted 28Apr2006

Presentation 7: Gas Insulated Power Transformers   posted 28Apr2006

 

This page is maintained by: webmaster

Last update: 13-Dec-2011

IEEE prohibits discrimination, harassment and bullying.  For more information, visit http://www.ieee.org/web/aboutus/whatis/policies/p9-26.html