Power Transformers Subcommittee

Power Transformers Subcommittee Scope

  • Study and review power transformers and reactors with particular attention to service requirements of installations in the western United States and Canada.
  • Develop and maintain related standards, recommended practices and guides for such products.
  • Coordinate with other technical committees, groups, societies and associations as required.

Chair:

Joe Watson

ZTZ Services, Inc.

USA

Phone: (561) 371-9138

E-Mail: joe_watson@ieee.org

Vice-Chair:

Bill Griesacker

Doble Engineering Company

85 Walnut Street

Watertown, MA  02472  U.S.A

Phone: 412-264-3266

E-Mail: bgriesacker@doble.com

Secretary:

Kipp J. Yule

Bechtel Power Corp

5275 Westview Drive

Frederick, MD 21703-8306, USA

Phone: (301) 228-6624

Email: kjyule@bechtel.com

Agenda/Topics for Next Meeting

Spring 2015 Agenda   Posted 8Apr2015

Previous Meeting Discussions/Topics

 

Working Groups

Project or Standard Number

Title

Status

WG or
TF

Chair (C), Vice-Chair (VC), Secretary (S)

Available Downloads – Contact the Chair for Password and Access

Document or Current Draft

References or
WG/TF Webpage

C57.12.10

Revision of C57.12.10, 230kV and Below Safety Requirement

Active

Publ.: Corr. 2012

Par Exp.: 12/31/19

Due: 12/31/2020

 .

Gary Hoffman - Chair

Phone: (973) 474-2171

grhoffman@advpowertech.com

C57.12.10-2010 Cor2-2013

C57.12.10-2010 Cor1-2012

C57.12.10-2010

Posted 10Apr2015 Special password required

Spring 2015 PC57.12.10 Agenda Posted 10Apr2015

 

C57.17

Revision of Requirements for Arc Furnace Transformers

Active

Publ.: Orig IEEE Std. 17

Due: 12/31/2022

WG

Robert Ganser - Chair

Phone: (330) 492-8433

rganser@ieee.org

.

.

C57.93

Revision of IEEE Guide for Installation and Maintenance of Liquid-Immersed Power Transformers

Active

Publ.:

Par Exp.: 12/31/16

Due: 12/31/2018

WG

Mike Lau - Chair

Phone: (604) 224-9343

mike.lau@wicor.com

.

C57.93 Web Page

PC57.116

Revision of Guide for Transformers Directly Connected to Generators

Active

Publ.: 2005

Par Exp.: 12/31/15

Due: 12/31/2018

WG

Garry Hoffman - Chair

Phone: (973) 474-2171

grhoffman@advpowertech.com

Draft 2.1

Draft 1.4

.

PC57.125

Revision of Guide for Failure Investigation, Documentation, Analysis and Reporting for Power Transformers and Shunt Reactors

Active

Publ.: Will replace C57.117

Par Exp.: 12/31/15

Due: 12/31/2018

WG:

Wallace Binder - Chair

Phone: (724) 654-3839

wbbinder@ieee.org

Tom Melle - Vice Chair

Phone: (919) 239-5943

trmelle@ncsu.edu

John Roach - Secretary

 Phone: (860) 722-5125

John_Roach@hsb.com

C57.125 D5.1 Posted 04Mar2014

C57.125 Web Page

C57.131/ 60214-1

IEEE Standard for Load Tap Changers

Active

Publ.: 2012

Due: 12/31/2022

TF

Craig Colopy - Chair

Phone: (262) 896-2342

CraigAColopy@Eaton.com

C57.131-2012 Password Reqrd.

14-60214-1-Ed2 Password Reqrd.

.

60214-2

Tap-Changer Application Guide

Active

WG

Craig Colopy - Chair

Phone: (262) 896-2342

CraigAColopy@Eaton.com

60214-2-Draft Password Reqrd.

 

Minutes - Supporting Documents posted 13Jan2015

C57.135

Revision of Guide for the Application, Specification and Testing of Phase-Shifting Transformers

Inactive

Publ.: 2001

IEEE/IEC Dual Logo 2005, IEC 62032 Ed. 1

Due: 12/31/2021

WG

Jin Sim - Chair

jin.sim@ieee.org

.

.

PC57.140

Revision of Guide for Evaluation and Reconditioning of Liquid-Immersed Power Transformers

Active

Publ.: 2006

Par Exp.: 12/31/15

Due: 12/31/2018

WG

Paul Boman - Chair

Phone: (785) 256-7161

paul_boman@hsb.com

C57.140-2006 Special Password Rqrd.

Draft 5A Password Reqrd

Straw Ballot Comment Status  5Apr2015

Spring 2013 Agenda 08Mar2013

Fall 2012 Minutes 08Mar2013

Fall 2011 Assignments

Fall 2011 Proposed Revisions

PC57.143

Development of Guide for Application of Monitoring to Liquid-Immersed Transformers and Components

Inactive

Publ.: 2013

Due: 12/31/2023

.

Donald Chu - Chair

chud@coned.com

.

Ballot Complete

C57.148

IEEE Standard for Control Cabinets for Power Transformers

Inactive

Publ.: 2011

Due: 12/31/2021

 .

Joe Watson - Chair

joe_watson@ieee.org

.

.

PC57.150

Development of Guide for the Transportation of Transformers and Reactors Rated 10,000kVA or Larger

Inactive

Publ.: 2012

Due: 12/31/2022

WG

Greg Anderson - Chair

gwanderson@ieee.org

.

.

PC57.153

Development of Guide for Paralleling Transformers

Active

Publ.: New Project

Par Exp.: 12/31/14

WG

Tom Jauch - Chair

Phone: (813) 634-1422

jauch@ieee.org

PC57.153 D9.2 Posted 18Mar2014

Spring 2014 Minutes Posted 05Jun2014

PC57.156

Development of Guide for Transformer Tank Rupture Mitigation of Liquid-Immersed Power Transformers and Reactors

Active

Publ.: New Project

Par Exp.: 12/31/15

WG

Peter Zhao - Chair

Phone: (416) 345-5926

peter.zhao@hydroone.com

PC57.156 D3  Posted 14Oct2014

Spring 2014 Minutes Posted 05Jun2014

F11 TIB Presentation 14Nov2011

PC57.157

Development of Guide for Conducting Functional Life Tests for De-Energized Tap Changer Contacts

Active

Publ.: New Project

Par Exp.: 12/31/15

WG

Phil Hopkinson - Chair

Phone:  (704) 846-3290

phopkinson@ieee.org

Adam Sewel - Secretary

Phone:  330-872-5707

adamsewell@qualityswitch.com

Draft 6.1 6Apr2015

C57.157 Web Page

IEEE 638

Revision of IEEE Standard for Qualification of Class 1E Transformers for Nuclear power Generating Stations

Active

Publ.: 2006

Par Exp.: 12/31/13

Due: 12/31/2018

WG

Craig Swinderman - Chair

Phone: (901) 566-3801

craig.swinderman@meppi.com

.

.

IEEE/IEC 60076-57-12

Development of Standard Requirements for Phase Shifting Transformers

Active

Publ.: New Project

Par Exp.: 12/31/16

WG

Raj Ahuja - Chair

Phone: (510) 979-4888

raj.ahuja@spx.com

.

Spring 2014 Minutes Posted 05Jun2014

Fall 2012 Overview  24Oct2012

Special PW required for WG access only for the following documents:

IEC 60076-1{ed3.0}b  29Nov2012

IEC 60076-3{ed2.0}b  29Nov2012

IEEE C57.12.00-2010  29Nov2012

IEEE C57.12.90-2010  29Nov2012

IEEE C57.135-2011  29Nov2012

 

This page is maintained by: webmaster

Last update: 10-Apr-2015