|
Power
Transformers Subcommittee
Power
Transformers Subcommittee Scope
- Study and review power
transformers and reactors with particular
attention to service requirements of
installations in the western United States and
Canada.
- Develop and maintain related
standards, recommended practices and guides for
such products.
- Coordinate with other technical
committees, groups, societies and associations as
required.
|
|
Chair:
Tom
Lundquist
Lundquist
Consulting Services, Inc.
1241
N. Bronco Lane
Gilbert,
AZ 85233
U.S.A.
Phone:
(480) 225-1670
Fax:
E-Mail:
Tom.Lundquist@ieee.org
|
Vice-Chair:
Joe
Watson
HICO
America
Pittsburgh,
PA
USA
Phone:
(412) 787-1170 ext. 205
E-Mail: joe_watson@ieee.org
|
|
Secretary:
Bill
Griesacker
Doble
Engineering Company
85 Walnut Street
Watertown, MA 02472 U.S.A
Phone: 412-264-3266
E-Mail:
bgriesacker@doble.com
|
|
Minutes of
Previous Meetings
See Transformers Committee
Minutes
Fall
2011 Agenda Updated
29Oct2011
|
Working Groups
-
Arc
Furnace Transformers WG, Revision of C57.17
-
DPV
- Grid Transformers TF, Chair, Hemchandra M. Shertukde
Fall
2011 TF Meeting Minutes posted
23Nov2011 Fall
2011 Position
Paper posted 23Nov2011, password
required to accessTF
Assignments posted 19Apr 2009IEEE
Std. 929 Annex E & F posted 1 9Apr2009, password
required to access IEC
60076-16 Ed.1 posted
21Mar2011,
special password
required to access
C57.140
WG
Fall
2011 Assignments
Posted
17Oct2011
Fall
2011 Proposed Revisions
Posted
18Oct2011
C57.140
Draft 1 Regular
Committee password
required for access. Posted 19Oct2011
C57.140-2006
Special password
required for access. Posted 17Oct2011
Spring
2011 Agenda Posted
9Apr2011
Monitoring
of Liquid-Filled Transformers WG, New C57.143
Section
5.3
PC57.143
Draft 20 Posted
7Mar2008
password required for access
Changes
Since Fall 2007 Meeting Posted 7Mar2008
-
Control
Cabinet WG, New C57.148
PC57.148
Draft 4 password required for access,
Posted
20Mar2006
Drawings:
Comparison of
Styles (Excel file) password required for access
PC57.153
Draft 5 Clause 4 password required for access,
posted
13Dec2011 Draft
Guide Comment form D5, Clause 3
posted
13Dec2011
PC57.153
Draft 5 Clause 9 password required for access,
posted
02Dec2011 Draft
Guide Comment form D5, Clause 9
posted
02Dec2011
PC57.153
Draft 4 password required for access,
posted
01Sep2
Draft
Guide Comment for D4
posted 01Sep2011
Outline
posted 07Sep2010
Comments
- Section 2.5 through 6 posted
27Sep2010
Section
6 through 9 and Appendix B password
required for access, posted
01OctComments
- Section 6 through 9 & Appendix B
posted 27Sep2010
Fall
2010 WG Minutes
posted
13Mar2011
Spring
2009
Agenda and Presentation
posted
19Apr2009
-
Transformer
Tank Rupture and Mitigation WG,
PC57.156 - Chair Peter Zhao, Vice-Chair Robert Thompson
PC57.156
Draft 1 password required for access,
posted
26Oct2011F11
TIB Presentation
posted
14Nov2011
Fall
2006
Presentation
6: Transformer Rupture HQ Perspective posted
04Dec2006
Presentation
8: Review of IEEE Stds on Topic posted 04Dec2006
Presentation
9: Sealed Tank posted 04Dec2006
Spring
2006
Presentation
1: Transformer Rupture Statistics posted
28Apr2006
Presentation
2: Prevention of Tank Rupture posted 28Apr2006
Presentation
3: Pressure Relief Devices and Their Use on Transformers posted 28Apr2006
Presentation
4: Transformer Explosion Prevention (PowerPoint file) posted 28Apr2006
Presentation
5: Natural Ester Based Fluid Evaluation
posted
28Apr2006
Presentation
7: Gas Insulated Power Transformers posted
28Apr2006
|
This page is maintained by: webmaster
Last update: 13-Dec-2011
|