Jul 2012 Plenary Meeting

Location:

Number Status Submitted Standard Clause Subject Draft
0007
Closed
Published 2011-08-01 802.1Q/D1.5 10.6 incorrect operPointToPointMAC references 802.1Qbg-d2-2 Show
0020
Closed
Published 2011-12-21 802.1Q-2011 10.8.1.2, 10.8.2.8 Inconsistent text when NumberOfValues is zero 802.1Q-cor-2-d2-0 Show
0033
Closed
Published 2012-04-20 802.1aq-2012 13.29.32 Inconsistency of text for updtDigest() 802.1Q-cor-2 Show
0004
Closed
Rejected 2011-04-07 802.1Q-2005 13.37.1 No path cost for 40Gbps links Show
0029
Closed
Published 2012-02-14 802.1Q-2011 17.5.2, IEEE8021-BRIDGE-MIB Missing T-Component creation text and ennumeration 802.1Q-cor-2-d2-0 Show
0022
Closed
Published 2012-01-11 802.1Q-2011 17.7.6 MSTP MIB issues 802.1Q-cor-2-d2-0 Show
0003
Closed
Published 2011-03-26 802.1Q-2011 20.2.2, 20.28.2, 12.14 Inconsistent VID for Loopback Reply (LBR) frames 802.1aq-d4-6 Show
0037
Closed
Rejected 2012-06-21 802.1Q-2011 20.9 New MEPoperational is operational status Show
0036
Closed
Published 2012-06-21 802.1Q-2011 20.9.1 MEPactive is administrative status 802.1Q-REV Show
0026
Closed
Rejected 2012-02-06 802.1Q-2011 22.1,22.5 Flow Classification and Queuing for CBP Show

Back