May 2013 Interim Meeting

Location:

Number Status Submitted Standard Clause Subject Draft
0006
Closed
Published 2011-06-23 802.1AS-2011 various Corrigendum items agreed to in AVB TG 802.1AS-cor-1 Show
0059
Closed
Published 2012-11-01 802.1AS-2011 10.2.2.2.1 req59 802.1AS-cor-1 Show
0061 Complete then Ballot 2012-11-01 802.1AS-2011 10.2.6.1.1 local variables 802.1AS-Rev Show
0062
Closed
Published 2012-11-01 802.1AS-2011 10.3.11.2.1 req62 802.1AS-cor-1 Show
0065
Closed
Rejected 2012-11-01 802.1AS-2011 10.2.6.3 req65 Show
0004
Closed
Rejected 2011-04-07 802.1Q-2005 13.37.1 No path cost for 40Gbps links Show
0037
Closed
Rejected 2012-06-21 802.1Q-2011 20.9 New MEPoperational is operational status Show
0019
Closed
Published 2011-11-17 802.1Q-2011 6.1 Incorrect Link Aggregation figure for bridges 802.1Q-cor-2-d2-0 Show
0036
Closed
Published 2012-06-21 802.1Q-2011 20.9.1 MEPactive is administrative status 802.1Q-REV Show
0018
Closed
Published 2011-11-17 802.1Q-2011 6.10 Incorrect figure reference 802.1Q-cor-2-d2-0 Show

Back