Leadership:
·
Jonathan Segev (Intel
Corporation), Chair
·
Assaf Kasher (Qualcomm),
Vice-chair
·
Chao-Chun Wang (MediaTek),
Roy Want (Google), Technical Editors
·
Assaf Kasher (Qualcomm),
Secretary
March 2022
– Plenary Electronic Meeting
Jan. 2022
– Interim Electronic Meeting
Nov. 2021 –
Plenary Electronic Meeting
Sep. 2021 –
Interim Electronic Meeting
July 2021 –
Plenary Electronic Meeting
May 2021 –
Interim Electronic Meeting
March 2021 – Plenary Electronic Meeting
Jan. 2021 –
Interim Electronic Meeting
Nov. 2020 –
Plenary Electronic Meeting
Sep.
2020 – Interim Electronic Meeting
July 2020 –
Plenary Electronic Meeting
Jan. 2020
– Irvine, California
March 2019
– Vancouver, Canada
Jan. 2019 –
St. Louis, Missouri
July 2018 –
San Diego, California
March 2018
– Rosemont, Illinoi
Jan. 2018 –
Irvine, California
March 2017
– Vancouver, Canada
Nov. 2016 –
San Antonio, Texas
July 2016 –
San Diego, California
January
2016 – Atlanta, Georgia
September
2015 – Bangkok, Thailand
On January 2015 the Next Generation Positioning Study
Group (NGP SG) a study group within the IEEE 802.11 working group
had started its activity to address the needs of a
Station to identify its absolute and relative position to another station or
stations it’s either associated or unassociated with.
The NGP SG has successfully developed a PAR and CSD
documents and project 802.11az initiated its work on Sep. 2015.
To defines modifications to both the IEEE 802.11
medium access control layer (MAC) and physical layers (PHY)
of High Throughput (HT), Very High Throughput (VHT),
Directional Multi Gigabit (DMG)
and PHYs under concurrent development (e.g. High
Efficiency WLAN (HEW), Next Generation 60GHz (NG60))
that enables determination of absolute and relative
position with better accuracy with respect to the Fine Timing Measurement (FTM)
protocol
executing on the same PHY-type, while reducing
existing wireless medium use and power consumption and is scalable to dense
deployments.
·
Draft P802.11az D4.1 and a
redline version in comparison to D4.0 can be
found here.
·
11-17/462
Spec Framework Document working Draft (R16)
·
11-16/424 TGaz
Functional Requirements Document (final version)
·
11-16/137 TG
approved Use Case document
·
11-21-1501 - P802.11az Report to EC on Approval to go to SA
ballot
·
11-21-1471 – LB255 CR database
·
11-22-0084 – revision history of the TGaz Initial SA Ballot CR
database on mentor
·
11-22-198 – SA#1 TGaz CID Resolution Status
Leadership:
·
Chair - Jonathan Segev (Intel Corporation)
·
Vice chair – Assaf Kasher (Qualcomm)
·
Technical Editors - Chao-Chun Wang (MediaTek), Roy
Want (Google)
·
TG Secretary – Assaf Kasher (Qualcomm)
Group met during the following meeting slots:
·
March 7 Mon. 13:30 – 15:30
ET
·
March 8 Tue. 13:30
– 15:30 ET
·
March 9 Wed. 13:30 – 15:30 ET
·
March 10 Thu. 13:30
– 15:30 ET
·
March 14 Mon. 13:30 – 15:30 ET
Main
meeting documents:
·
11-22-224 – TGaz March Meeting and following telecons agenda
·
Draft P802.11az D4.1 - latest
available draft
·
11-22-0448 – TGaz March
2022 Plenary electronic meeting minutes
·
11-22-225 – TGaz March 2022 Closing report
·
11-22-0084 – TGaz Initial SA Ballot CR DB*
*11-22-0084 replaces
previous 11-21-1827 as the group response for SA Ballot, and renumbers the
comments received as part of SA#1.
Main meeting achievements and status:
·
Continued SA Ballot CR:
o Reviewed and approved resolutions
to 34 Technical and General comments
which
constitutes 20% of the received Technical and General comments received.
o Resolved ~80% of all technical
and general comments.
o WG approved a request to EC to forward
P802.11az D4.0 to ISO/IEC JTC1/SC6 for information
Under
the PSDO agreement.
Planed
Teleconferences till the March. meeting:
·
March 16th Wed. 13:00
– 15:00 ET
·
March 23rd Wed. 13:00
– 15:00 ET
·
March 30th Wed. 13:00
– 15:00 ET
·
April 6th Wed. 13:00
– 15:00 ET
·
April 13th Wed. 13:00
– 15:00 ET
·
April 20th Wed. 13:00
– 15:00 ET
·
April 27th Wed. 13:00
– 15:00 ET
·
May 4th Wed. 13:00
– 15:00 ET
** - Denotes
the meeting as part of the IEEE week, refer to WG agenda document for details.
Note: TGaz now operates as CRC during its telecons.
Goals
Towards May meeting and beyond:
·
Complete response to 802.11az
SA Ballot #1.
·
Recirculate out of the May
meeting.
Timelines
and program management:
·
The TG reviewed project progress
and timelines with no change to its timelines and with the following program
progress:
List of meeting submissions:
https://mentor.ieee.org/802.11/dcn/22/11-22-0225-00-00az-tgaz-march-closing-report.pptx
https://mentor.ieee.org/802.11/dcn/22/11-22-0084-02-00az-11az-sa-comments-database.xlsx
https://mentor.ieee.org/802.11/dcn/20/11-20-0771-46-00az-tgaz-plenary-meeting-motion-compendium.pptx
https://mentor.ieee.org/802.11/dcn/22/11-22-0402-03-00az-some-sab1-cr-v3.docx
https://mentor.ieee.org/802.11/dcn/22/11-22-0198-02-00az-cid-resolution-status-for-tgaz-sa1.xlsx
https://mentor.ieee.org/802.11/dcn/22/11-22-0437-02-00az-some-sab1-passive-tb-ranging-cr.docx
https://mentor.ieee.org/802.11/dcn/22/11-22-0451-00-00az-comment-resolution-sa1-ltf-vector.docx
https://mentor.ieee.org/802.11/dcn/22/11-22-0400-02-00az-tgaz-sab1-group-cr-part-4.docx
https://mentor.ieee.org/802.11/documents?is_dcn=489&is_group=00az&is_year=2022
Leadership:
·
Chair - Jonathan Segev (Intel Corporation)
·
Vice chair – Assaf Kasher (Qualcomm)
·
Technical Editors - Chao-Chun Wang (MediaTek), Roy
Want (Google)
·
TG Secretary – Assaf Kasher (Qualcomm)
Group met during the following meeting slots:
·
Jan. 17 Mon. 13:30
– 15:30 ET
·
Jan. 20 Thu. 13:30
– 15:30 ET
·
Jan. 24 Mon. 13:30
– 15:30 ET
Main
meeting documents:
·
11-21-1945 – TGaz January Meeting and following telecons agenda
·
Draft P802.11az D4.0 - latest
available draft
·
11-22-0103 – TGaz Jan.
2022 Plenary electronic meeting minutes
·
11-21-1946 – TGaz Jan. 2022 Closing report
·
11-22-0084 – TGaz Initial SA Ballot CR DB*
*11-22-0084 replaces previous 11-21-1827 as the group response for SA Ballot, and renumbers the comments received as part of SA#1.
Main meeting achievements and status:
·
Continued SA Ballot CR:
o Group resolved 27 comments and
adopted additional text changes.
o Resolved ~50% of all technical
and general comments.
Planed
Teleconferences till the March. meeting:
·
Feb. 3rd Thu. 12:00
– 14:00 ET*
·
Feb. 9th Wed. 13:00
– 15:00 ET*
·
Feb. 16th Wed. 13:00 – 15:00 ET*
·
Feb. 23rd Wed. 13:00 – 15:00 ET*
·
Mar. 2nd Wed. 13:00 – 15:00 ET*
* - Denotes a newly announced meeting.
** - Denotes
the meeting as part of the IEEE week, refer to WG agenda document for details.
Note: TGaz now operates as CRC during its telecons.
Goals
Towards March meeting and beyond:
·
Complete assignment of
P802.11 D4.0 SA1 comments.
·
Resolve 60 technical/General
comments (~33% of SA1 T+G comments).
Timelines
and program management:
·
The TG reviewed project progress
and timelines with no change to its timelines and with the following program
progress:
List of meeting submissions:
https://mentor.ieee.org/802.11/dcn/21/11-21-1946-00-00az-tgaz-january-closing-report.pptx
https://mentor.ieee.org/802.11/dcn/20/11-20-0771-39-00az-tgaz-plenary-meeting-motion-compendium.pptx
https://mentor.ieee.org/802.11/dcn/22/11-22-0084-00-00az-11az-sa-comments-database.xlsx
https://mentor.ieee.org/802.11/dcn/22/11-22-0102-01-00az-tgaz-sa1-group-cr.xls
https://mentor.ieee.org/802.11/dcn/22/11-22-0168-01-00az-tgaz-sab1-group-cr-part-2.docx
https://mentor.ieee.org/802.11/dcn/22/11-22-0156-01-00az-some-sab1-cr.docx
https://mentor.ieee.org/802.11/dcn/22/11-22-0148-00-00az-comment-resolution-sa1-various-part-2.docx
https://mentor.ieee.org/802.11/dcn/22/11-22-0149-00-00az-comment-resolution-sa1-various-part-3.docx
Leadership:
·
Chair - Jonathan Segev (Intel Corporation)
·
Vice chair – Assaf Kasher (Qualcomm)
·
Technical Editors - Chao-Chun Wang (MediaTek), Roy
Want (Google)
·
TG Secretary – Assaf Kasher (Qualcomm)
Group met during the following meeting slots:
·
Nov. 9 Tue. 13:30 – 15:30
ET
·
Nov. 11 Tue. 13:30 – 15:30
ET
·
Nov. 15 Wed. 13:30 – 15:30 ET
Main
meeting documents:
·
11-21-1607 – TGaz Nov. electronic meeting’s and proceeding
telecon meetings’ agenda
·
Draft P802.11az D4.0 latest
available draft
·
11-21-1834 – TGaz Nov.
2021 Plenary electronic meeting minutes
·
11-21-1608 – TGaz Nov. 2021 Closing report
·
11-21-1827 – TGaz Initial SA Ballot CR DB
Main meeting achievements and status:
·
TGaz circulated an unchanged P802.11az D4.0 (LB256) resulting in no
comments to an unchanged draft and that was followed by Initial SA Ballot.
·
SA ballot completed Nov. 5th UTC 23:59.
·
P802.11az D4.0 Initial SA Ballot results:
o TGaz circulated an unchanged P802.11az
D4.0 (LB256) resulting in no comments to an unchanged draft and that was
followed by Initial SA Ballot.
o SA ballot completed Nov. 5th UTC
23:59.
o P802.11az D4.0 Initial SA Ballot
results:
364
total comments: 166 Technical/ 192 Editorial / 6 General
·
Conducted assignment to 1/3 of the technical comments received in
P802.11az D4.0 SA1
·
Started SA1 comment resolution to extent possible.
·
Responded to WFA Liaison.
·
Complete assignment of P802.11 D4.0 SA1 comments.
·
Resolve 60 technical/General comments (~33% of SA1 T+G comments).
Planed
Teleconferences till the Jan. meeting:
·
Dec. 2nd Thu. 12:00 – 14:00 ET*
·
Dec. 9th Thu. 12:00 – 14:00 ET*
·
Dec. 16th Thu. 12:00 – 14:00 ET*
·
Jan. 6th Thu. 12:00 – 14:00 ET*
·
Jan. 13th Thu. 12:00 – 14:00 ET*
* - Denotes a newly announced meeting.
** - Denotes
the meeting as part of the IEEE week, refer to WG agenda document for details.
+ - Denotes plenary (motion) meeting.
Goals
Towards Jan. meeting and beyond:
·
Complete assignment of
P802.11 D4.0 SA1 comments.
·
Resolve 60 technical/General
comments (~33% of SA1 T+G comments).
Timelines
and program management:
·
The TG reviewed project
progress and timelines with no change to its timelines:
List of submissions meeting documents:
https://mentor.ieee.org/802.11/dcn/20/11-20-0771-32-00az-tgaz-plenary-meeting-motion-compendium.pptx
https://mentor.ieee.org/802.11/dcn/21/11-21-1827-00-00az-sa1-tgaz-d4-0-comments.xlsx
https://mentor.ieee.org/802.11/dcn/21/11-21-1439-01-00az-sep-2021-telecon-minutes.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-1503-00-00az-september-2021-interim-minutes.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-1580-05-00az-wfa-sec-review-resp.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-1843-01-00az-comment-resolution-sa1-various.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-1875-01-00az-comment-resolution-sa1-txvector.docx
Leadership:
·
Chair - Jonathan Segev (Intel Corporation)
·
Vice chair – Assaf Kasher (Qualcomm)
·
Technical Editors - Chao-Chun Wang (MediaTek), Roy
Want (Google)
·
TG Secretary – Assaf Kasher (Qualcomm)/Dibakar Das
(Intel Corporation) (acting)
Group met during the following meeting slots:
·
Sep. 13 Mon. 11:15 – 13:15 ET
·
Sep. 14 Tue. 13:30 – 15:30
ET
·
Sep. 15 Wed. 13:30 – 15:30 ET
·
Sep. 20 Mon. 13:30 – 13:30 ET
Main
meeting documents:
·
11-21-1297 – TGaz Sep. electronic and proceeding telecon
meetings’ agenda
·
Draft P802.11az D4.0 latest
available draft
·
11-21-1503 – TGaz Sep.
2021 Plenary electronic meeting minutes
·
11-21-1298 – TGaz Sep. 2021 Closing report
·
11-21-1501 - P802.11az Report to EC on Approval to go to SA
ballot
·
11-21-1471 – LB255 CR DB
Main meeting achievements and status:
·
WG approved request to forward P802.11az D4.0 to the 802 EC to
considering for SA ballot.
·
Approved P802.11az Report to EC on Unconditional Approval to go to SA
ballot.
·
Reaffirm the approved TGaz CSD, in anticipation of the SA ballot
request.
·
Approved a 10 day recirculation of unchanged P802.11az D4.0.
·
Reviewed and approved resolution to 36 technical, 41 editorial
comments, by that completing response to LB 255 without a change to D4.0 of
P802.11az
·
Reviewed and set path forward to respond for incoming communication
from WFA (11-21-1524).
Planed
Teleconferences till the Nov. meeting:
·
Sep. 29 Wed. 13:00 – 15:00 ET
·
Oct. 4 Mon. 13:00 – 15:00 ET*+
·
Nov. 8 Mon. 13:30 – 15:30 ET**
* - Denotes a newly announced meeting.
** - Denotes
the meeting as part of the IEEE week, refer to WG agenda document for details.
+ - Denotes plenary (motion) meeting.
Goals
Towards November meeting and beyond:
·
Execute complete and respond
to a 10 day recirculation ballot on unchanged D4.0 .
·
Execute a 31 day Initial SA
ballot per EC approval.
·
Review initial response to
WFA communication.
Timelines
and program management:
·
The TG reviewed project
progress and timelines as per denoted by the Report to EC:
List of submissions meeting documents:
https://mentor.ieee.org/802.11/dcn/21/11-21-1524-00-0000-communication-from-wfa-re-p802-11az.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-0771-28-00az-tgaz-plenary-meeting-motion-compendium.pptx
https://mentor.ieee.org/802.11/dcn/21/11-21-1298-00-00az-tgaz-sep-closing-report.pptx
https://mentor.ieee.org/802.11/dcn/21/11-21-1471-02-00az-lb-255-comments.xlsx
https://mentor.ieee.org/802.11/dcn/21/11-21-1521-02-00az-lb255-pics-comment-resolution-part-2.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-1517-00-00az-lb255-cr-for-cid-6052.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-1439-01-00az-sep-2021-telecon-minutes.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-1507-00-00az-18-cid-resolution-for-lb255.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-1119-00-00az-july-2021-plenary-minutes.docx
Leadership:
·
Chair - Jonathan Segev (Intel Corporation)
·
Vice chair – Assaf Kasher (Qualcomm)
·
Technical Editors - Chao-Chun Wang (MediaTek), Roy
Want (Google)
·
TG Secretary – Assaf Kasher (Qualcomm)
Group met during the following meeting slots:
·
July 12 Mon. 11:15 – 13:00 ET
·
July 13 Tue. 11:15 – 11:45
ET, 13:30 – 15:00 ET
·
July 14 Wed. 13:30
– 15:00 ET
·
July 15 Thu. 13:30 – 15:00
ET
·
July 16 Fri. 13:30
– 15:00 ET
·
July 19 Mon. 13:30 – 15:00 ET
Main
meeting documents:
·
11-21-0880 – TGaz July electronic and proceeding telecon
meetings’ agenda
·
Draft P802.11az D3.2 latest
available draft
·
11-21-1119 – TGaz July
2021 Plenary electronic meeting minutes
·
11-21-0881 – TGaz July Closing report
Main meeting achievements and status:
·
Reviewed and approved 22 submission containing resolution to:
o 119 Technical,
o 2 General and
o 192 Editorial comments
by that
completing response to LB253 recirculation ballot initiated out of the July
meeting.
·
A total of 34 motions considered by the group during the week.
·
WG approved a motion instructing the editor to prepare D4.0 and
initiate a 15-day WG Recirculation Ballot.
·
Completed and approved changes in response to MDR.
·
Published a new draft ,P802.11az D3.2.
·
The TG considered its timelines without change and is maintaining its
current timeline.
Planed
Teleconferences till the September meeting**:
·
Sep. 1, 8 Wed. 13:00 – 15:00 ET
*Previously announced.
**WG May
meeting is running September 13th – 21st, refer to WG
agenda for details of TG meetings during this interval.
+ Plenary (motion) meeting.
Goals
Towards September meeting and beyond:
·
Execute next recirculation
ballot, pending WG approval (later during this meeting).
·
Start comment resolution
received on P802.11az D4.0.
Timelines
and program management:
·
The TG reviewed project
progress and timelines with no changes to milestones:
List of submissions meeting documents:
https://mentor.ieee.org/802.11/dcn/21/11-21-0881-00-00az-tgaz-july-closing-report.pptx
https://mentor.ieee.org/802.11/dcn/21/11-21-0258-08-00az-lb253-comments.xlsx
https://mentor.ieee.org/802.11/dcn/21/11-21-0329-07-0000-tgaz-mdr-report.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-0771-23-00az-tgaz-plenary-meeting-motion-compendium.pptx
https://mentor.ieee.org/802.11/dcn/21/11-21-0989-00-00az-cid5044-resolution-for-lb253.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-1027-04-00az-cr-formisc-cids-part-1.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-1070-01-00az-lb253-resoluiton-to-cid-set5.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-1084-01-00az-lb253-july-tg-cr.xlsx
https://mentor.ieee.org/802.11/dcn/21/11-21-1108-04-00az-lb253-phase-shift-toa-feedback-cr.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-1112-03-00az-lb253-passive-tb-ranging-mlme-cr.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-1113-02-00az-lb253-passive-tb-ranging-cr-part-iv.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-1155-03-00az-lb253-misc-comments-part-2.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-1156-03-00az-lb253-resoluiton-to-cid-set6.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-1160-03-00az-cr-for-misc-cids-part-2.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-1108-04-00az-lb253-phase-shift-toa-feedback-cr.docx
Leadership:
·
Chair - Jonathan Segev (Intel Corporation)
·
Vice chair – Assaf Kasher (Qualcomm)
·
Technical Editors - Chao-Chun Wang (MediaTek), Roy
Want (Google)
·
TG Secretary – Assaf Kasher (acting)
Group met during the following meeting slots:
·
May 10th 13:30 ET, 2hrs
·
May 12th 13:30 ET, 2hrs
·
May 17th 13:30 ET, 2hrs
Main
meeting documents:
·
11-21-0486 – TGaz May electronic and proceeding telecon
meetings’ agenda
·
Draft P802.11az D3.0 latest
available draft
·
11-21-0807 – TGaz May
2021 Plenary electronic meeting minutes
·
11-21-0487 TGaz May Closing report
Main meeting achievements and status:
·
During the meeting the TG review and approved resolutions to a total of
36 CIDs.
·
Reviewed the initial MDR finding.
·
Initiated MDR process and received most of the findings (editors).
·
Reviewed timeline and project progress towards July LB recirculation.
Planed
Teleconferences till the July meeting**:
·
May 26* Wed. 13:00 – 15:00 ET
·
June 2, 9, 16, 23, 30 Wed. 13:00 – 15:00 ET
·
June 24 + Thur. 10:00 – 12:00 ET
·
July 7 Wed. 13:00 – 15:00 ET
*Previously announced.
**WG May
meeting is running July 11th – 16th, refer to WG agenda
doc.
+ Plenary (motion) meeting.
Goals
Towards July meeting and beyond:
·
Complete LB253 comment
resolution.
·
Generate P802.11az D3.1
adopting resolutions from March and May meetings.
·
Respond to MDR findings
(Editors).
Timelines
and program management:
·
The TG reviewed its timelines
with no changes to milestones:
List of submissions meeting documents:
https://mentor.ieee.org/802.11/dcn/21/11-21-0486-07-00az-tgaz-may-meeting-agenda.pptx
https://mentor.ieee.org/802.11/dcn/21/11-21-0487-00-00az-tgaz-may-closing-report.pptx
https://mentor.ieee.org/802.11/dcn/21/11-21-0749-07-00az-cid-resolution-status-for-tgaz-lb253.xlsx
https://mentor.ieee.org/802.11/dcn/21/11-21-0258-04-00az-lb253-comments.xlsx
https://mentor.ieee.org/802.11/dcn/20/11-20-0771-16-00az-tgaz-plenary-meeting-motion-compendium.pptx
https://mentor.ieee.org/802.11/dcn/21/11-21-0810-02-00az-three-cid-resolutions-for-lb253.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-0811-01-00az-lb253-misc-comments.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-0815-01-00az-misc-cid-on-trigger-frame-format.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-0329-05-0000-tgaz-mdr-report.docx
Leadership:
·
Chair - Jonathan Segev (Intel Corporation)
·
Vice chair – Assaf Kasher (Qualcomm)
·
Technical Editors - Chao-Chun Wang (MediaTek), Roy
Want (Google)
·
TG Secretary – Assaf Kasher (acting)
Group met during the following meeting slots:
·
March 9th 13:30 ET,
2hrs
·
March 10th 13:30 ET,
2hrs
·
March 11th 13:30 ET,
2hrs
Main
meeting documents:
·
11-21-0188 – TGaz January electronic and proceeding telecon
meetings’ agenda
·
Draft P802.11az D3.0 latest
available draft
·
11-21-0422* – TGaz March
2021 Plenary electronic meeting minutes
·
11-21-0189 TGaz January Closing report
* Link to
become active once the document is uploaded.
Main meeting achievements and status:
·
D3.0 successfully completed LB253 with 89% approval.
·
LB253 resulted in:
o 476 comments total
o 258 technical/general comments
o 218 editorial comments.
·
During the meeting the TG review and approved resolutions to a total of
73 comments.
·
Conducted comment assignment to additional 78 comments, 67 comments
pending assignment.
·
Reviewed timeline and project progress towards July LB recirculation.
·
Initiated MDR process and received most of the findings (editors).
Planed
Teleconferences till January:
·
March 17*, 31 13:00 –
15:00 ET
·
March 25+ 10:00
– 12:00 ET
·
April 7,14,21 13:00
– 15:00 ET
·
April 29 + 10:00
– 12:00 ET
·
May 5, 26 13:00
– 15:00 ET
*Previously announced.
**WG May
meeting is running May 10th – 18th , refer to WG agenda doc.
+ Plenary (motion) meeting.
Goals
Towards May meeting and beyond:
·
Continue LB253 comment
resolution.
·
Generate P802.11az D3.1
adopting resolutions from March meeting.
·
Response to MDR findings
(Editors).
Timelines
and program management:
·
The TG reviewed its timelines
and updated the timeline:
List of submissions meeting documents:
https://mentor.ieee.org/802.11/dcn/21/11-21-0188-06-00az-tgaz-march-meeting-agenda.pptx
https://mentor.ieee.org/802.11/dcn/21/11-21-0258-02-00az-lb253-comments.xlsx
https://mentor.ieee.org/802.11/dcn/21/11-21-0307-03-00az-comment-resolution-lb253-parameters.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-0346-02-00az-lb253-resolution-to-cid-set1.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-0291-03-00az-lb-253-crs-a.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-0189-01-00az-tgaz-march-closing-report.pptx
https://mentor.ieee.org/802.11/dcn/21/11-21-0329-04-0000-tgaz-mdr-report.docx
Leadership:
·
Chair - Jonathan Segev (Intel Corporation)
·
Vice chair – Assaf Kasher (Qualcomm)
·
Technical Editors - Chao-Chun Wang (MediaTek), Roy
Want (Google)
·
TG Secretary – Assaf Kasher (acting)
Group met during the following meeting slots:
·
Jan. 11th 13:30 ET, 2hrs
·
Jan. 12th 13:30 ET, 2hrs
·
Jan. 13th 13:30 ET, 2hrs
·
Jan. 14th 13:30 ET, 2hrs
Main
meeting documents:
·
11-20-1919 – TGaz January electronic and proceeding telecon
meetings’ agenda
·
Draft P802.11az D2.6 latest
available draft
·
11-21-0072 – TGaz January
2021 interim electronic meeting minutes
·
11-20-1920 TGaz January Closing report
Main meeting achievements and status:
·
Group completed comment resolution for LB249 and approved a 15 day
recirculation ballot (pending WG approval).
·
The 15 day recirculation ballot is LB253 opened Jan. 26, 2021 at 23:59
ET and expected to complete by Feb. 10, 2021 11:59ET.
Link
to TGaz technical ballot: https://www.ieee802.org/11/LetterBallots/LB253az/LB253_instructions.html
·
Main discussion topic: modifications to the 11az Secure PHY mode.
Planed
Teleconferences till January:
·
Feb. 3rd (Wed.), 13:00
ET – 15:00 ET
·
Feb. 18th (Thu.), 12:00
ET – 14:00 ET
·
Feb. 24th (Wed.), 13:00
ET – 15:00 ET
·
Mar. 3rd (Wed.),
13:00 ET – 15:00 ET
Goals
Towards March meeting and beyond:
·
Publish a new draft(s) D3.0.
·
Execute recirculation ballot.
Timelines
and program management:
·
The TG reviewed its timelines
and approved the following updated timeline:
List of submissions reviewed during the week:
https://mentor.ieee.org/802.11/dcn/21/11-21-0047-02-00az-cr-for-misc-remaining-cids.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-0048-04-00az-misc-text-clarification.docx
https://mentor.ieee.org/802.11/dcn/21/11-21-0053-01-00az-comment-resolution-lb249-cid-3260.docx
Leadership:
·
Chair - Jonathan Segev (Intel Corporation)
·
Vice chair – Assaf Kasher (Qualcomm)
·
Technical Editors - Chao-Chun Wang (MediaTek), Roy
Want (Google)
·
TG Secretary – Assaf Kasher (acting)
Group met during the following meeting slots:
·
Nov. 3rd 11:15 ET, 2hrs
·
Nov. 3rd 13:30 ET, 2hrs
·
Nov. 4th 11:15 ET, 2hrs
·
Nov. 4th 13:30 ET, 2hrs
·
Nov. 5th 11:15 ET, 2hrs
·
Nov. 5th 13:30 ET, 2hrs
·
Nov. 9th 13:30 ET, 2hrs
Main
meeting documents:
·
11-20-1570 – TGaz Sep electronic and proceeding telecon
meetings’ agenda
·
Draft P802.11az D2.5 latest
available draft
·
11-20-1774 – TGaz
November 2020 Plenary electronic meeting minutes
·
11-20-1797 TGaz November Closing report
Main meeting achievements and status:
·
114 comments motioned
·
~472 out of 482 technical and general comments with ~11 comments
remaining.
·
Resolved all 540 editorial comments.
·
No consensus on LTF Security Comment Resolution (CR) topic.
Planed
Teleconferences till January:
·
Dec. 2nd (Wed.), 13:00
ET – 15:00 ET
·
Dec. 9th (Wed.),
13:00 ET – 15:00 ET
·
Dec. 16th (Wed.),
13:00 ET – 15:00 ET +
+ - newly announced, telecons will be 2hr long.
Goals
Towards March meeting and beyond:
·
Publish a new minor draft(s)
D2.6, which includes all adopted CR from the Sep. meeting.
·
Complete comment resolution
for LB249.
Timelines
and program management:
·
Last approved timeline is as
follows:
List of submissions reviewed during the week:
https://mentor.ieee.org/802.11/dcn/20/11-20-1719-05-00az-tgaz-lb240-comment-resolution.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-1731-01-00az-comment-resolution-lb249-phy-cid-4014.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-1245-06-00az-tx-power-control-for-non-tb-ranging.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-1745-00-00az-resolution-for-14-editorial-cids.xlsx
https://mentor.ieee.org/802.11/dcn/20/11-20-1354-01-00az-lb249-cr-mac-miscellaneous.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-1653-04-00az-lmr-timestamps-part-ii.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-1556-05-00az-lmr-timestamp-clock-and-reporting.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-1733-03-00az-phase-shift-feedback-response.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-1749-00-00az-pftm-state1a.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-1759-01-00az-resolution-for-cid3099-lb249.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-1787-03-00az-lb249-resolution-to-cid-3635.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-1649-05-00az-lb249-secure-ltf-and-other-cids.docx
Leadership:
·
Chair - Jonathan Segev (Intel Corporation)
·
Vice chair – Assaf Kasher (Qualcomm)
·
Technical Editors - Chao-Chun Wang (MediaTek), Roy
Want (Google)
·
TG Secretary – Assaf Kasher (acting)
Group met during the following meeting slots:
·
Sep. 15th 13:30 ET, 2hrs
·
Sep. 16th 13:30 ET, 2hrs
·
Sep. 17th 13:30 ET, 2hrs
Main
meeting documents:
·
11-20-1370 – TGaz Sep electronic and proceeding telecon
meetings’ agenda
·
Draft P802.11az D2.4 latest
available draft
·
11-20-1482 – TGaz
September 2020 interim electronic meeting minutes
·
11-20-1511 TGaz Sep Closing report
Main meeting achievements and status:
·
Adopted resolutions for 92 comments towards completion of LB249.
·
Remaining ~170 technical and ~20 editorial comments.
·
Published new minor draft 2.3 – please use that for submissions.
·
Committed to recirculate out of the Nov. meeting.
·
Increased telecon times in view of that – 3 weekly slots, 2hr each
Planed
Teleconferences till January:
·
Sep. 23 (Wed.), 13:00
ET – 14:30 ET
·
Sep. 24 (Thu.), 10:00
ET – 12:00 ET extended (joint TGaz plenary/technical)
·
Sep. 29 (Tue.), 13:00 ET – 15:00 ET +
·
Sep. 30 (Wed.), 13:00 ET – 15:00 ET +
·
Oct. 1 (Thu.), 12:00 ET – 14:00 ET +
·
Oct. 6 (Tue.), 13:00 ET – 15:00 ET +
·
Oct. 7 (Wed.), 13:00 ET – 15:00 ET +
·
Oct. 8 (Thu.), 12:00 ET – 14:00 ET +
·
Oct. 13 (Tue.), 13:00 ET – 15:00 ET +
·
Oct. 14 (Wed.), 13:00 ET – 15:00 ET +
·
Oct. 15 (Thu.), 12:00 ET – 14:00 ET +
·
Oct. 20 (Tue.), 13:00 ET – 15:00 ET +
·
Oct. 21 (Wed.), 13:00 ET – 15:00 ET +
·
Oct. 29 (Thu.), 10:00
ET – 12:00 ET extended (joint TGaz plenary/technical) +
Goals
Towards March meeting and beyond:
·
Complete resolving comments
originating from LB249 and recirculate out of the Nov. meeting.
·
Publish a new minor draft(s)
D2.4, which includes all adopted CR from the Sep. meeting.
·
Publish a new major draft
D3.0 out of November.
Timelines
and program management:
·
TG considered its timelines
and committed to the following timelines:
·
List of submissions reviewed during the week:
https://mentor.ieee.org/802.11/dcn/20/11-20-1370-08-00az-tgaz-sep-meeting-agenda.pptx
https://mentor.ieee.org/802.11/dcn/20/11-20-1020-08-00az-some-lb-249-passive-tb-ranging-cr.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-1308-00-00az-lmr-rsc-clarification.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-1245-03-00az-tx-power-control-for-non-tb-ranging.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-1392-02-00az-cr-for-11-22-6-3-3.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-1393-01-00az-misc-cr-for-clause-9.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-1394-01-00az-misc-cr-for-clause-11.docx
Leadership:
·
Chair - Jonathan Segev (Intel Corporation)
·
Vice chair – Assaf Kasher (Qualcomm)
·
Technical Editors - Chao-Chun Wang (MediaTek), Roy
Want (Google)
·
TG Secretary – Assaf Kasher (acting)
Group met during the following meeting slots:
Main
meeting documents:
·
11-20-1002 – TGaz July to Sep meetings agenda
·
Draft P802.11az D2.2 latest
available draft
·
11-20-1195 – TGaz Meeting Minutes July 15th, 2020 Telecon
(Plenary)
Planed
Teleconferences till January:
·
July 22 (Wednesday), 13:00 ET – 14:30 ET
·
July 29 (Wednesday), 13:00 ET – 14:30 ET
·
Aug. 5 (Wednesday), 13:00 ET – 14:30 ET
·
Aug. 19 (Wednesday), 13:00 ET – 14:30 ET
·
Aug. 26 (Wednesday), 13:00 ET – 14:30 ET
List of submissions reviewed during the week:
https://mentor.ieee.org/802.11/dcn/20/11-20-1002-02-00az-tgaz-july-to-sep-meetings-agenda.pptx
https://mentor.ieee.org/802.11/dcn/20/11-20-0963-00-00az-cid-3880-kdk-hltk.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-0698-02-00az-lb249-cid3940-resolution.docx
Leadership:
·
Chair - Jonathan Segev (Intel Corporation)
·
Vice chair – Assaf Kasher (Qualcomm)
·
Technical Editors - Chao-Chun Wang (MediaTek), Roy
Want (Google)
·
TG Secretary – Assaf Kasher (acting)
Group met during the following meeting slots:
Main
meeting documents:
·
11-19-2121 – TGaz January meeting agenda
·
Draft P802.11az D2.0 latest
available draft
·
11-20-2122 – TGaz January closing report
·
11-20-140 – Meeting Minutes January 2020 session
Main meeting achievements and status:
·
Adopted ~70 resolutions of LB249 technical comments.
·
Assigned 339 technical comments to members (from total of 460 technical
received comments).
·
Reviewed a total of 13 submissions.
Planed
Teleconferences till January:
·
Jan. 29 (Wednesday), 13:00 ET – 14:30 ET
·
Feb. 5 (Wednesday), 13:00 ET – 14:30 ET
·
Feb. 12 (Wednesday), 13:00 ET – 14:30 ET
·
Feb. 19 (Wednesday), 13:00 ET – 14:30 ET
·
Feb. 26 (Wednesday), 13:00 ET – 14:30 ET
·
Mar. 25 (Wednesday), 13:00 ET – 14:30 ET
Goals
Towards March meeting and beyond:
·
Continue LB249 comment
resolution with the intent to recirculate out of May meeting (1.5 hr weekly
telecons and ad hocs).
·
Publish a new baseline minor
draft D2.1 coming out of the January meeting for use by CRC, which includes all
adopted CR from January meeting.
·
Have a 3 day ad hoc for the
purpose of comment resolution.
·
Complete 50% of LB249
technical comments out of the March meeting.
Ad hoc
announcement
·
TGaz is scheduled to hold a 3
day ad hoc March 9-11th sponsored by Intel in the SF bay area.
·
Please announce your
participation by responding to the poll here.
Timelines
and program management:
·
TG timelines out of the
January meeting (no change):
List of submissions reviewed during the week:
https://mentor.ieee.org/802.11/dcn/19/11-19-2121-07-00az-tgaz-jan-meeting-agenda.pptx
https://mentor.ieee.org/802.11/dcn/19/11-19-2005-00-00az-meeting-minutes-november-2019-session.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-0017-03-00az-lb249-comment.xlsx
https://mentor.ieee.org/802.11/dcn/20/11-20-0121-00-00az-resolution-to-lb249-cid3130.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-0118-01-00az-lb249-clause-28-cids.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-0137-03-00az-lb249-clause-11-22-6-4-2-cids.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-0126-02-00az-lb249-comment-resolutions-part-1.docx
https://mentor.ieee.org/802.11/dcn/20/11-20-0167-01-00az-lb240-clause-12-2-11-cids.docx
Leadership:
·
Chair - Jonathan Segev (Intel Corporation)
·
Vice chair – Assaf Kasher (Qualcomm)
·
Technical Editors - Chao-Chun Wang (MediaTek), Roy
Want (Google)
·
TG Secretary – Assaf Kasher (acting)
Group met during the following meeting slots:
Main
meeting documents:
·
11-19-1713 – TGaz November meeting agenda
·
Draft P802.11az D1.5 latest available draft
·
11-19-2005 - Meeting-Minutes-November-2019-session
·
11-19-1714 – TGaz Closing report November meeting
·
11-19-1898 - Ad Hoc Meeting Minutes Nov 2019 Session
·
11-19-1811 -TGaz-telecon-minutes-October-November-2019
·
11-19-1771 - October 16th Teleconference Minutes
·
11-19-1729 - TGaz-telecon-minutes-October-2nd-2019
·
11-19-1490 - Ad Hoc Meeting Minutes Sep 2019 Session
Main meeting achievements and status:
·
Adopted 258 comments, 205 technical and 53 editorial, by that completed
CR for LB240.
·
Approved generation of P802.11az draft D2.0 and initiation of WG
recirculation ballot.
·
Updated TG timelines.
Planed
Teleconferences till January:
·
Nov. 20th (Wednesday),
13:00 ET – 14:30 ET – cancelled.
·
Jan. 8th (Wednesday),
13:00 ET – 15:00 ET (2hr)
Jan. 2020
plans:
·
Generate P802.11az D2.0.
·
Initiate and complete
recirculation ballot.
·
Review recirculation ballot
results.
Timelines
and program management:
TG updated timelines out of
the November meeting:
Previous
TG updated timelines:
List of submissions reviewed during the week:
https://mentor.ieee.org/802.11/dcn/19/11-19-1713-11-00az-tgaz-nov-meeting-agenda.pptx
https://mentor.ieee.org/802.11/dcn/19/11-19-1599-00-00az-meeting-minutes-september-2019-session.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1729-00-00az-tgaz-telecon-minutes-october-2nd-2019.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1771-00-00az-october-16th-teleconference-minutes.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1951-01-00az-non-tb-pathloss-measurements.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1674-02-00az-lb240-resolution-to-cid-1059.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-2003-01-00az-ista-passive-lmr-element-cr.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1717-03-00az-strongest-tap-ftm-for-pdmg-pedmg.pptx
https://mentor.ieee.org/802.11/dcn/19/11-19-1991-02-00az-misc-unassigned-comments-part-2.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-2009-01-00az-resolution-for-50-editorial-cids.xlsx
https://mentor.ieee.org/802.11/dcn/19/11-19-2008-00-00az-cr-to-cid-1921-in-lb240.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1875-02-00az-lb240-first-path-tap-measurement-cids.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-2013-01-00az-lb240-various-cid-resolutions.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1958-01-00az-lb240-cr-mac-miscellaneous.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-2032-04-00az-on-unintentional-beamforming.pptx
https://mentor.ieee.org/802.11/dcn/19/11-19-2050-00-00az-passive-tb-ranging-lmr-reporting-cr.docx
Leadership:
Chair - Jonathan Segev (Intel
Corporation)
Vice chair – Assaf Kasher (Qualcomm)
Technical Editors - Chao-Chun Wang
(MediaTek), Roy Want (Google)
TG Secretary – Assaf Kasher (acting)
Group met during the following meeting slots:
Main
meeting documents:
·
11-19-1360 – TGaz September meeting agenda
·
Draft P802.11az D1.4 latest
available draft
·
11-19-1361 – TGaz Closing report July meeting
·
11-19-1273 – TGaz Approved July meeting minutes
·
11-19-1490 – TGaz Sep. Ad
hoc meeting minutes
·
11-19-1403 – TGaz Telecon minutes July 31st 2019
·
11-19-1410 – TGaz Telecon minutes Aug. 7th 2019
·
11-19-1439 – TGaz Telecon minutes Aug. 14th 2019
·
11-19-1463 – TGaz Telecon Minutes Aug. 21st 2019
Main meeting achievements and status:
·
Published two minor revision to 11az draft D1.3 and D1.4.
·
Adopted resolutions to +240 technical comments.
·
Evaluated current status and plans for re-circulation ballot.
·
Group met for 8 meeting slots and reviewed a total of 20 submissions.
·
Group updated its timeline to reflect target recirculation out of Nov.
meeting.
Planed
Teleconferences till Nov. meeting plus 1:
·
Oct. 2nd (Wednesday), 13:00 ET – 14:30 ET
·
Oct. 9th (Wednesday), 13:00 ET – 14:30 ET
·
Oct. 16th (Wednesday), 13:00 ET – 14:30 ET
·
Oct. 30th (Wednesday) , 13:00 ET – 14:30 ET
·
Nov. 20th (Wednesday), 13:00 ET – 14:30 ET
Nov. 2019
plans:
·
Complete LB240 comment resolution
and initiate a recirculation ballot coming out of the Nov. meeting.
·
Publish a new baseline minor
draft D1.5 coming out of the Sep. meeting for use by CRC, which includes all
adopted CR from Sep. meeting.
·
Have a 3 day ad hoc for the
purpose of comment resolution.
Oct./Nov.
Ad-hoc meeting announcement:
When:
·
Nov. 6 — 8 (Wed — Friday)
·
9:00 – 17:30 on all days.
Where:
·
250 S. Mathilda Ave,
Sunnyvale, CA 94086 USA, sponsored by Apple.
Timelines
and program management:
·
TG updated progress over the
approved timelines:
List of submissions reviewed during the week:
https://mentor.ieee.org/802.11/dcn/19/11-19-1360-12-00az-tgaz-sep-meeting-agenda.pptx
https://mentor.ieee.org/802.11/dcn/19/11-19-1273-00-00az-meeting-minutes-july-2019-session.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1403-00-00az-telecon-minutes-july-31st-2019.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1410-01-00az-telecon-minutes-august-7th-2019.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1439-00-00az-telecon-minutes-august-14th-2019.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1463-00-00az-tgaz-telecon-minutes-august-21st-2019.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1464-00-00az-tgaz-telecon-minutes-august-28th-2019.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1507-02-00az-clause-11-22-6-4-9-cids.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1537-01-00az-lb240-resolution-of-cid1295.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1587-02-00az-lb240-cr-annex-c.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1621-02-00az-addressing-various-lb-240-cids.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1365-04-00az-comment-resolution-for-misc-cids.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1437-03-00az-security-related-comment-from-lb240.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1624-01-00az-secure-ranging-mode-minor-bug-fix.docx
Leadership:
·
Chair - Jonathan Segev (Intel Corporation)
·
Vice chair – Assaf Kasher (Qualcomm)
·
Technical Editors - Chao-Chun Wang (MediaTek), Roy
Want (Google)
·
TG Secretary – Assaf Kasher (acting)
Group met during the following meeting slots:
Main meeting documents:
·
11-19-946 – TGaz July meeting agenda
·
Draft P802.11az D1.2 latest available draft
·
11-19-947 – TGaz Closing report July meeting
·
11-19-882 – TGaz Approved May meeting minutes
·
11-19-1046 – TGaz June Ad hoc meeting minutes
·
11-19-1197 – TGaz Telecon minutes July 10th 2019
·
11-19-1205 – TGaz Telecon minutes June 19th 2019
·
11-19-1198 – TGaz Telecon minutes June 5th 2019
·
11-19-981 – TGaz Telecon Minutes May 29th 2019
Main meeting achievements and status:
·
Adopted roughly 160 technical comments.
·
Published two minor revision to 11az draft D1.2 and D1.1.
·
Performed comment assignment of most of the remaining CIDs.
·
Group met for 8 meeting slots and reviewed a total of 29 submissions.
·
Continued effort to meet the projected re-circ ballot out of Sep.
meeting.
·
TGaz PAR extension approved by EC.
Planed
Teleconferences till Sep. meeting plus 1:
·
July 24th (Wednesday), 13:00 ET – 14:30 ET
·
July 31st (Wednesday), 13:00 ET – 14:30 ET
·
Aug. 7th (Wednesday), 13:00 ET –
14:30 ET
·
Aug. 14th (Wednesday), 13:00 ET – 14:30 ET
·
Aug. 21st (Wednesday), 13:00 ET – 14:30 ET
·
Aug. 28th (Wednesday) , 13:00 ET – 14:30 ET
Sep. 2019
plans:
·
Complete LB240 comment
resolution by end of Sep. meeting and recirculate out of the Sep. meeting.
·
Publish a new baseline draft
D1.3 including all adopted CR from July meeting.
·
Have a 3 day ad hoc for the
purpose of comment resolution..
Sep. 4th
Ad-hoc meeting announcement:
When:
·
September 4th-6th,
2019 9:00-17:30 for all days, sponsored by Broadcom.
Where:
·
280 Innovation Drive (Bldg.
E2), San Jose CA 95134 USA.
Timelines
and program management:
TG updated
progress over the approved timelines:
List of submissions reviewed during the week:
https://mentor.ieee.org/802.11/dcn/19/11-19-0946-13-00az-tgaz-july-meeting-agenda.pptx
https://mentor.ieee.org/802.11/dcn/19/11-19-0882-02-00az-meeting-minutes-may-2019-session.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-0981-00-00az-telecon-minutes-may-29th-2019.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1197-00-00az-telecon-minutes-july-10th-2019.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1198-00-00az-telecon-minutes-june-5th-2019.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1205-00-00az-telecon-minutes-june-19th-2019.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-0970-04-00az-pasn-state1a-related-text.docx
https://mentor.ieee.org/802.11/dcn/19/11-19-1062-06-00az-edca-ftm-negotiations.docx