| 
		 Meeting Materials  | 
		||
| 
		 
		All Files    | 
		||
| General Information | ||
| 
		 
		Agenda and General Information 
		  | 
		Bill Woodruff | Broadcom | 
| 
		 
		Approved Minutes  | 
		George Zimmerman | 
		CME Consulting / Commscope | 
	
| Liaisons and Communications | ||
| Presentations | 
| 
		Major PAR Form Questions 23-Sept 12 (87k)  | 
		David Law | HP | 
| 
		Project Objectives 21-Sept 12 (188k)  | 
		Dan Dove | Applied Micro | 
| 
		Review of the 5 Criteria 21-Sept 12 (232k)  | 
		John D'Ambrosia | Dell | 
| 
		ISO/IEC SC 25/WG 3 - an overview 21-Sept 12 (78k)  | 
		Alan Flatman | LAN Technologies | 
| 
		TIA TR42.7 Next 
		Generation Cabling Project Update 21-Sept 12 (28k)  | 
		Valerie Maguire | Siemon | 
| 
		Cabling Parameters 25-Sept 12 (343k) supporting materials (cable insertion loss vs. length calculator) 23-Sept-12 (2.5MB)  | 
		Wayne Larsen | Commscope | 
| 
		Length Distribution 21-Sept 12 (176k)  | 
		Wayne Larsen | Commscope | 
| 
		Preliminary Study: Modeled
		40G Reach on category cabling 21-Sept 12 (1569k)  | 
		Paul Vanderlaan | Nexans | 
| 
		Cabling Challenges and Opportunities 24-Sept 12 (291k)  | 
		Ron Nordin Bob Wagner  | 
		Panduit Panduit  | 
	
| 
		 NGBASE-T Link Segments 21-Sept 12 (292k)  | 
		Chris DiMinico | MC Communications | 
| 
		Server NIC
		Market Update from CFI 23-Sept 12 (672k)  | 
		David Chalupsky | Intel | 
| 
		Considerations for Objectives in 
		Next-Gen BASE-T 21-Sept 12 (140k)  | 
		George Zimmerman | CME Consulting / Commscope | 
| 
		An 
		Overview of Energy-Efficient Ethernet 25-Sept 12 (26k)  | 
		Mike Bennett Wael Diab  | 
		LBNL Broadcom  | 
	
| 
		NGBASE-T Considerations: Reach and Migration Path 23-Sept 12 (378k)  | 
		Brad Booth David Koenen  | 
		Dell HP  | 
	
| 
		NGBASE-TSR - A Scalable BASE-T Approach 25-Sept 12 (1142k)  | 
		Dan Dove | Applied Micro | 
| 
		Thoughts on Rate Objective 25-Sept 12 (328k)  | 
		John D'Ambrosia Wael Diab  | 
		Dell Broadcom  | 
	
| 
		Next Generation BASE-T: a Simple model of Relative Power Cost vs. Reach 25-Sept 12 (384k)  | 
		Will Bliss | Broadcom | 
| 
		Proposed objectives for Next-Gen BASE-T 21-Sept 12 (79k) as updated during the meeting: Proposed objectives for Next-Gen BASE-T 2-Oct 12 (82k)  | 
		George Zimmerman | CME Consulting / Commscope | 
| 
		Drafting the 5 Criteria 25-Sept-12 (167k)  | 
		David Chalupsky | Intel | 
| 
		Filling in the PAR 25-Sept 12 (25k) as updated during the meeting: Filling in the PAR 2-Oct 12 (26k) Filling in the PAR Part Deux 2-Oct 12 (13k)  | 
		Wael Diab | Broadcom | 
| Presentations Received During the Meeting | ||
| 
		Major factor for an Objective: LENGTH 25-Sept-12 (52k)  | 
		Geoff Thompson | GraCaSI | 
Return to Next Generation BASE-T Study Group Public Area
Last Update: 02-Octiber-2012
      
         
     | 
    
      
         | 
    
        
           
     | 
    
        
           
     |