|
all_files.zip 22-Mar-04 3956K |
|||||
|
Approved Meeting Minutes 2-Jun-04 139K |
John D'Ambrosia | Tyco Electronics | |||
| Opening
Plenary Report 22-Mar-04 90K |
Adam Healey | Agere Systems | |||
|
Agenda and General Information 22-Mar-04 163K |
Adam Healey | Agere Systems | |||
| 10
GbE Serial PHY Requirements 11-Mar-04 105K |
Michael
Altmann Aniruddha Kundu |
Intel | |||
| Relative
Cost for Backplanes and Blades 16-Mar-04 135K |
John
D'Ambrosia Jimmy Sheffield |
Tyco Electronics | |||
|
Next
Generation System Costs: A True Look |
Mike Oltmanns Brian Seemann John Mitchell |
Interconnect Technologies Teradyne Xilinx Winchester Electronics |
|||
| Channel
Model Criteria 16-Mar-04 1021K |
Joel Goergen | Force10 Networks | |||
| Ethernet
over the backplane system requirements 12-Mar-04 277K |
Tom Palkert | Xilinx | |||
| Market
Drivers and Cost Considerations in Support of 40 inch average grade FR4
backplane links at 10Gb/s per lane 22-Mar-04 395K |
Bill Hoppin others |
Synopsys refer to presentation for complete listing |
|||
| 1/10Gbps
Autonegotiation Schemes 12-Jan-04 90K |
Luke Chang Brad Booth |
Intel | |||
| Case
for Enhancing Ethernet Capabilities for Backplane Fabric Interconnects 15-Mar-04 299K |
Gopal Hegde | Intel | |||
| Throughput
& Latency Control in Ethernet Backplane Interconnects 11-Mar-04 255K |
Manoj Wadekar |
Intel | |||
| Developing
a Channel Model to Include Variance 11-Mar-04 1059K |
John
D'Ambrosia Greg Sheets |
Tyco
Electronics Agere Systems |
|||
| Comparison
of PAM-4 and NRZ Signaling 11-Mar-04 68K |
Stephen Anderson others |
Xilinx for complete listing |
|||
| Backplane
Ethernet Auto-Negotiation 17-Mar-04 50K |
Thomas Jorgensen | Vitesse | |||
| FR-4
Definition 17-Mar-04 109K |
Joel Goergen | Force10 Networks | |||
| Closing
Plenary Report 22-Mar-04 135K |
Adam Healey | Agere Systems |
Return to IEEE 802.3 Backplane
Ethernet Study Group Home Page
Last Update: 02 Jun 04
|
|
|
|