Meeting Materials for:
      
Interim Meeting
            Week of May 23rd-25th, 2016
            Whistler, BC, Canada
        
      
All Files
      Download all meeting materials here:
      Updated 22-May-2016
    
    
| Title | Updated | Author(s) | Affiliation | 
|---|---|---|---|
| General Information | 
        |||
| Agenda updated | 23-May-2016 | 
          Mark Nowell | 
          Cisco  | 
        
| 50 Gb/s and NGOATH Ethernet Ad-hoc report updated | 23-May-2016 | Kent Lusted | 
          Intel | 
        
| 802.3cd
              Editorial Consideration | 
          20-May-2016 | Matt Brown | 
          APM | 
        
| Minutes 
            approved | 
          27-July-2016 | 
          Kent Lusted | 
          Intel | 
        
| Liaisons | 
        |||
| Proposed Liaison to TR-42 updated | 19-May-2016 | 
          Paul Kolesar | 
          Commscope | 
        
| Contributed Presentations | |||
| Nomenclature updated | 24-May-2016 | Kent Lusted | Intel | 
        
| Multi-Port Implementations of 50/100/200GbE updated | 23-May-2016 | Scott Kipp | 
          Brocade | 
        
| The Missing Objectives updated | 23-May-2016 | Brad Booth | 
          Microsoft | 
        
| 50GBASE-FR
              & -LR Specification Proposal | 
          18-May-2016 | Chris Cole | 
          Finisar | 
        
| Towards 50 Gb/s per lane
              MMF baseline proposals updated | 
          23-May-2016 | Jonathan King Jonathan Ingham  | 
          Finisar Foxconn Interconnect Technology  | 
        
| Baseline proposal for the 100 Gb/s MMF objective using two-wavelength PAM4 transmission updated | 23-May-2016 | Jonathan Ingham | 
          Foxconn Interconnect
            Technology | 
        
| 100GBASE-SR2 MMF baseline proposal updated | 23-May-2016 | Jonathan King | Finisar | 
        
| RS(544,514)
              FEC performance  | 
          18-May-2016 | Pete Anslow | 
          Ciena | 
        
| FEC coding gain analysis in 50GE &100GbE updated | 23-May-2016 | Tongtong Wang Xinyuan Wang  | 
          Huawei Huawei  | 
        
| Architectural Consideration for 50 GbE and NG 100 GbE updated | 24-May-2016 | Ali Ghiasi | 
          Ghiasi Quantum | 
        
50GbE and NG 100GbE PCS and FEC Baseline Proposals updated  | 
          24-May-2016  | 
          Gary Nicholl Mark Gustlin David Ofelt  | 
          Cisco Xilinx Juniper  | 
        
| Technical considerations
              for FEC Lane Distribution  | 
          18-May-2016 | Gary
            Nicholl | 
          Cisco | 
        
50GAUI and CAUI C2C and C2M Baseline Proposals for 50G and Next Gen 100G Ethernet  | 
          18-May-2016  | 
          Mike Peng Li Rich Mellitz Adee Ran Ali Ghiasi  | 
          Intel Intel Intel Ghiasi Quantum  | 
        
| COM
              Parameter Baseline Proposal for Copper Cables updated | 
          24-May-2016 | Chris Roth | 
          Molex | 
        
| COM Analysis on Backplane and Cu DAC Channels updated | 24-May-2016 | Ali Ghiasi | Ghiasi Quantum | 
| TX
              differential precoder for 50G/NGOATH updated | 
          24-May-2016 | Raj Hegde Magesh Valliappan  | 
          Broadcom Broadcom  | 
        
| PAM4
              transmitter training protocol  | 
          18-May-2016 | Adam Healey Jeff Slavick  | 
          Broadcom Broadcom  | 
        
| Baseline
              proposals for copper twinaxial cable specifications  | 
          20-May-2016 | 
          Chris Diminico | 
          MC Communications | 
        
| Late
              Contribution | 
        |||
| OTN Support for 50GbE, next generation 100GbE, and 200 GbE | 18-May-2016 | Steve Trowbridge | Nokia | 
| Die Level
              PMD Specification | 
          19-May-2016 | 
          Rich Mellitz | 
          Intel | 
        
| Updated
              revision to COM model com_ieee8023_93a_163 revision document.  
          Fixes and clarifications from 162a  | 
          27-May-2016  | 
          Rich Mellitz  | 
          Intel  | 
        
Last Update: 27-July-2016