| Administrative attachments | 
  | 
Attachment A1 | 
  | 
IEEE 802.3 Opening agenda | 
  | 
Attachment A2 | 
  | 
IEEE 802.3 Closing agenda | 
  | 
Attachment A3 | 
  | 
IEEE 802.3 Opening report | 
  | 
Attachment A4 | 
  | 
IEEE 802.3 Closing report | 
  | 
Attachment A5 | 
  | 
IEEE 802.3 Meeting attendance procedures | 
  | 
Attachment A6 | 
  | 
IEEE 802.3 Voting member list | 
  | 
Attachment A7 | 
  | 
IEEE 802.3 Potential voter list | 
  | 
Attachment A8 | 
  | 
IEEE 802.3 Voters in peril | 
  | 
Attachment A9 | 
  | 
IEEE 802.3 Attendance credit summary, July 2015 to October 2016 | 
  | 
Attachment A10 | 
  | 
IEEE 802.3 Attendance list San Antonio | 
  | 
Attachment A11 | 
  | 
IEEE 802.3 Treasury Report | 
  | 
Attachment A12 | 
  | 
IEEE 802.3 Standards status | 
  | 
Attachment A13 | 
  | 
IEEE 802.3 Future meetings closing report, 
Jan 2017 update, 
May 2018 host offer and 
Sep 2017 host offer | 
  | 
Attachment A14 | 
  | 
IEEE 802.3 Rules opening report | 
  | 
| Task Force and Study Group attachments | 
  | 
Attachment B1 | 
  | 
IEEE 802.3 Maintenance opening report | 
  | 
Attachment B2 | 
  | 
IEEE 802.3 Maintenance closing report | 
  | 
Attachment B3 | 
  | 
IEEE P802.3bn EPON Protocol over Coax (EPoC) Task Force opening report | 
  | 
Attachment B4 | 
  | 
IEEE P802.3bs 200 Gb/s and 400 Gb/s Ethernet Task Force opening report | 
  | 
Attachment B5 | 
  | 
IEEE P802.3bs 200 Gb/s and 400 Gb/s Ethernet Task Force closing report | 
  | 
Attachment B6 | 
  | 
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force opening report | 
  | 
Attachment B7 | 
  | 
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force closing report | 
  | 
Attachment B8 | 
  | 
IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) Task Force opening report | 
  | 
Attachment B9 | 
  | 
IEEE P802.3bu 1-Pair Power over Data Lines (PoDL) Task Force closing report | 
  | 
Attachment B10 | 
  | 
IEEE P802.3bv Gigabit Plastic Optical Fiber (GPOF) Task Force opening report | 
  | 
Attachment B11 | 
  | 
IEEE P802.3bv Gigabit Plastic Optical Fiber (GPOF) Task Force closing report | 
  | 
Attachment B12 | 
  | 
IEEE P802.3bz 2.5GBASE-T and 5GBASE-T Task Force opening report | 
  | 
Attachment B13 | 
  | 
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force opening report | 
  | 
Attachment B14 | 
  | 
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force closing report | 
  | 
Attachment B15 | 
  | 
IEEE P802.3cb 2.5 Gb/s and 5 Gb/s Backplane Task Force opening report | 
  | 
Attachment B16 | 
  | 
IEEE P802.3cb 2.5 Gb/s and 5 Gb/s Backplane Task Force closing report | 
  | 
Attachment B17 | 
  | 
IEEE P802.3cc 25 Gb/s Ethernet over single-mode fiber Task Force opening report | 
  | 
Attachment B18 | 
  | 
IEEE P802.3cc 25 Gb/s Ethernet over single-mode fiber Task Force closing report | 
  | 
Attachment B19 | 
  | 
IEEE P802.3cd 50Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force opening report | 
  | 
Attachment B20 | 
  | 
IEEE P802.3cd 50Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force closing report | 
  | 
Attachment B21 | 
  | 
IEEE P802.3.2 (IEEE 802.3cf) YANG data models Task Force opening report | 
  | 
Attachment B22 | 
  | 
IEEE P802.3.2 (IEEE 802.3cf) YANG data models Task Force closing report | 
  | 
Attachment B23 | 
  | 
IEEE 802.3 10 Mb/s single twisted pair Study Group opening report | 
  | 
Attachment B24 | 
  | 
IEEE 802.3 10 Mb/s single twisted pair Study Group closing report | 
  | 
Attachment B25 | 
  | 
Industry Connections Next Generation Enterprise/Campus/Data Center Ethernet opening report | 
  | 
Attachment B26 | 
  | 
Industry Connections Next Generation Enterprise/Campus/Data Center Ethernet closing report | 
  | 
Attachment B27 | 
  | 
Call for interest: Multi-Gig Automotive Ethernet PHY opening report | 
  | 
Attachment B28 | 
  | 
Call for interest: Multi-Gig Automotive Ethernet PHY closing report | 
  | 
| Liaison Attachments (External and Internal) | 
  | 
Attachment C1 | 
  | 
ISO/IEC SC25/WG3 report to IEEE 802.3 | 
  | 
Attachment C2 | 
  | 
TIA TR-42 Liaison Report to IEEE 802.3 | 
  | 
Attachment C3 | 
  | 
ISO/IEC JTC 1/SC 25 to IEEE 802.3 regarding elevated temperature operation of cabling 
 | 
  | 
Attachment C4 | 
  | 
ISO/IEC JTC 1/SC 25 to IEEE 802.3 regarding cabling TRs 
 | 
  | 
Attachment C5 | 
  | 
 OIF to IEEE P802.3bs and P802.3cd regarding progress on OIF CEI-56G projects 
Attachments (Password protected)
 
  | 
  | 
Attachment C6 | 
  | 
ISO TC22 SC32 to IEEE 802.3 regarding category A liaison request 
 | 
  | 
Attachment C7 | 
  | 
 ITU-T SG15 to IEEE 802.3 on OTNT standardization work plan 
Attachment (Password protected)
  | 
  | 
Attachment C8 | 
  | 
 ITU-T SG15 to IEEE 802.3 on management information models 
Attachments 149 Mb! (Password protected)
 
  | 
  | 
Attachment C9 | 
  | 
ITU-T SG15 to IEEE 802.3 on ANT standardization work plan 
 | 
  | 
Attachment C10 | 
  | 
ITU-T SG15 to IEEE 802.3 on HNT standardization work plan 
 | 
  | 
Attachment C11 | 
  | 
ITU-T SG15 to IEEE 802.3 on responses on the ANT and HNT work plans 
 | 
  | 
Attachment C12 | 
  | 
ITU-T SG15 to Broadband Forum on YANG management for PON 
 | 
  | 
Attachment C13 | 
  | 
TIA TR42 to IEEE 802.3 regarding 1-pair cabling and applications 
 | 
  | 
Attachment C14 | 
  | 
TIA TR42 to IEEE 802.3 regarding elevated temperature operation of cabling 
 | 
  | 
Attachment C15 | 
  | 
Broadband Forum to IEEE 802.3 on low power modes for fibre backhaul for FTTdp 
 | 
  | 
Attachment C16 | 
  | 
 COBO to IEEE P802.3 on progress update 
Attachment (Password protected)
 
  | 
  | 
Attachment C17 | 
  | 
OIF to IEEE 802.3 on start of 400ZR interop project 
 | 
  | 
Attachment C18 | 
  | 
DRAFT liaison response to the Broadband Forum on Low Power Modes for Fibre backhaul for FTTdp 
 | 
  | 
Attachment C19 | 
  | 
DRAFT liaison response to OIF on the 400ZR Interop Project 
 | 
  | 
Attachment C20 | 
  | 
DRAFT liaison response to ISO/IEC JTC 1/SC 6 on China NB comments 
 | 
  | 
Attachment C21 | 
  | 
DRAFT liaison response to ISO/IEC SC25 WG3 on high temperature operation of cabling 
 | 
  | 
Attachment C22 | 
  | 
DRAFT liaison response to TIA TR-42 on high temperature operation of cabling 
 | 
  | 
Attachment C23 | 
  | 
DRAFT liaison response to ISO TC22 SC32 on Category A liaison with IEEE 802.3 
 | 
  | 
Attachment C24 | 
  | 
Liaison response to the Broadband Forum on Low Power Modes for Fibre backhaul for FTTdp 
 | 
  | 
Attachment C25 | 
  | 
Liaison response to OIF on the 400ZR Interop Project 
 | 
  | 
Attachment C26 | 
  | 
Liaison response to ISO/IEC JTC 1/SC 6 on China NB comments 
 | 
  | 
Attachment C27 | 
  | 
Liaison response to ISO/IEC SC25 WG3 on high temperature operation of cabling 
 | 
  | 
Attachment C28 | 
  | 
Liaison response to TIA TR-42 on high temperature operation of cabling 
 | 
  | 
Attachment C29 | 
  | 
Liaison response to ISO TC22 SC32 on Category A liaison with IEEE 802.3 
 |