| Administrative attachments | 
  | 
Attachment A1 | 
  | 
IEEE 802.3 Opening agenda | 
  | 
Attachment A2 | 
  | 
IEEE 802.3 Closing agenda | 
  | 
Attachment A3 | 
  | 
IEEE 802.3 Opening report | 
  | 
Attachment A4 | 
  | 
IEEE 802.3 Closing report | 
  | 
Attachment A5 | 
  | 
IEEE 802.3 Meeting attendance procedures | 
  | 
Attachment A6 | 
  | 
IEEE 802.3 Voting member list | 
  | 
Attachment A7 | 
  | 
IEEE 802.3 Potential voter list | 
  | 
Attachment A8 | 
  | 
IEEE 802.3 Voters in peril | 
  | 
Attachment A9 | 
  | 
IEEE 802.3 Attendance credit summary, July 2016 to October 2017 | 
  | 
Attachment A10 | 
  | 
IEEE 802.3 Attendance list Orlando | 
  | 
Attachment A11 | 
  | 
IEEE 802.3 Treasury Report | 
  | 
Attachment A12 | 
  | 
IEEE 802.3 Standards status | 
  | 
Attachment A13 | 
  | 
IEEE 802.3 Future meetings closing report,
May 2018 update,
May 2019 offer, | 
  | 
Attachment A14 | 
  | 
IEEE 802.3 PARs Ad Hoc report | 
  | 
Attachment A15 | 
  | 
IEC/IEEE JWC proposal | 
  | 
| Task Force and Study Group attachments | 
  | 
Attachment B1 | 
  | 
IEEE 802.3 Maintenance opening report | 
  | 
Attachment B2 | 
  | 
IEEE 802.3 Maintenance closing report | 
  | 
Attachment B3 | 
  | 
IEEE P802.3bs 200 Gb/s and 400 Gb/s Ethernet Task Force opening report | 
  | 
Attachment B4 | 
  | 
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force opening report | 
  | 
Attachment B5 | 
  | 
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force closing report | 
  | 
Attachment B6 | 
  | 
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force opening report | 
  | 
Attachment B7 | 
  | 
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force closing report | 
  | 
Attachment B8 | 
  | 
IEEE P802.3cb 2.5 Gb/s and 5 Gb/s Backplane Task Force opening report | 
  | 
Attachment B9 | 
  | 
IEEE P802.3cb 2.5 Gb/s and 5 Gb/s Backplane Task Force closing report | 
  | 
Attachment B10 | 
  | 
IEEE P802.3cc 25 Gb/s Ethernet over single-mode fiber Task Force opening report | 
  | 
Attachment B11 | 
  | 
IEEE P802.3cd 50Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force opening report | 
  | 
Attachment B12 | 
  | 
IEEE P802.3cd 50Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force closing report | 
  | 
Attachment B13 | 
  | 
IEEE P802.3.2 (IEEE 802.3cf) YANG data models Task Force opening report | 
  | 
Attachment B14 | 
  | 
IEEE P802.3.2 (IEEE 802.3cf) YANG data models Task Force closing report | 
  | 
Attachment B15 | 
  | 
IEEE P802.3cg 10 Mb/s Single Twisted Pair Ethernet Task Force opening report | 
  | 
Attachment B16 | 
  | 
IEEE P802.3cg 10 Mb/s Single Twisted Pair Ethernet Task Force closing report | 
  | 
Attachment B17 | 
  | 
IEEE P802.3ch  Multi-Gig Automotive Ethernet PHY Task Force opening report | 
  | 
Attachment B18 | 
  | 
IEEE P802.3ch  Multi-Gig Automotive Ethernet PHY Task Force closing report | 
  | 
Attachment B19 | 
  | 
IEEE 802.3  Beyond 10 km optical PHYs Study Group opening report | 
  | 
Attachment B20 | 
  | 
IEEE 802.3  Beyond 10 km optical PHYs Study Group closing report | 
  | 
Attachment B21 | 
  | 
Industry Connections New Ethernet Applications opening report | 
  | 
Attachment B22 | 
  | 
Industry Connections New Ethernet Applications closing report | 
  | 
Attachment B23 | 
  | 
Call for interest: 10Mb/s Backplane Ethernet opening report | 
  | 
Attachment B24 | 
  | 
Call for interest: 10Mb/s Backplane Ethernet closing report | 
  | 
Attachment B25 | 
  | 
Call for interest: Beyond 10 km Optical 100 Gb/s PHYs opening report | 
  | 
Attachment B26 | 
  | 
Call for interest: Beyond 10 km Optical 100 Gb/s PHYs closing report | 
  | 
Attachment B27 | 
  | 
Call for interest: 100 Gb/s per Lane for Electrical Interfaces and PHYs opening report | 
  | 
Attachment B28 | 
  | 
Call for interest: 100 Gb/s per Lane for Electrical Interfaces and PHYs closing report | 
  | 
Attachment B29 | 
  | 
Call for interest: Next-generation 200 Gb/s and 400 Gb/s MMF fibre PHYs opening report | 
  | 
Attachment B30 | 
  | 
Call for interest: Next-generation 200 Gb/s and 400 Gb/s MMF fibre PHYs closing report | 
  | 
| Liaison Attachments (External and Internal) | 
  | 
Attachment C1 | 
  | 
ISO/IEC SC25/WG3 report to IEEE 802.3 | 
  | 
Attachment C2 | 
  | 
TIA TR-42 Liaison Report to IEEE 802.3 | 
  | 
Attachment C3 | 
  | 
ISO/IEC JTC1 SC25 to IEEE 802.3 on 1-pair cabling 
 | 
  | 
Attachment C3 | 
  | 
 OIF to IEEE P802.3bs and P802.3cd regarding progress on OIF CEI-56G-VSR-PAM4 project 
Attachment (Password protected)
 
  | 
  | 
Attachment C4 | 
  | 
NGMN Alliance to IEEE 802 on 5G end-to-end architecture framework 
Attachment (Password protected)
 
  | 
  | 
Attachment C5 | 
  | 
ITU-T SG15 to IEEE 802.3 regarding coordination on IM/DM for OAM 
Attachment (Password protected)
 
  | 
  | 
Attachment C6 | 
  | 
TIA TR-42 to IEEE 802.3 on connectors and topologies for single pair applications 
 | 
  | 
Attachment C7 | 
  | 
ITU-T SG15 to IEEE 802.3 regarding coherent 100 Gb/s DWDM interfaces 
 | 
  | 
Attachment C8 | 
  | 
ITU-T SG15 to IEEE 802.3 on timing performance due to Ethernet PHY 
 | 
  | 
Attachment C9 | 
  | 
 COBO to IEEE 802.3 regarding 8 & 16 lane on board optics specification D0.5 
Attachment (Password protected)
 
  | 
  | 
Attachment C10 | 
  | 
PI (PROFIBUS and PROFINET International) to IEEE P802.3cg on establishing an official liaison 
 | 
  | 
Attachment C11 | 
  | 
OIF to IEEE 802.3 regarding the 400ZR Interop Project 
 | 
  | 
Attachment C12 | 
  | 
DRAFT liaison to ITU-T SG15 regarding IEEE P802.3bs progress 
 | 
  | 
Attachment C13 | 
  | 
DRAFT liaison to OIF regarding IEEE P802.3bs progress 
 | 
  | 
Attachment C14 | 
  | 
DRAFT liaison to INCITS T11.2 regarding IEEE P802.3bs progress 
 | 
  | 
Attachment C15 | 
  | 
DRAFT liaison to ITU-T SG15 on the ANT workplan 
 | 
  | 
Attachment C16 | 
  | 
DRAFT liaison to ITU-T SG15 on the HNT workplan 
 | 
  | 
Attachment C17 | 
  | 
DRAFT liaison to ITU-T SG15 on the OTNT workplan 
 | 
  | 
Attachment C18 | 
  | 
DRAFT liaison to ISO/IEC JTC 1/SC 6 on China NB comment 
 | 
  | 
Attachment C19 | 
  | 
DRAFT liaison to Ethernet Alliance on PoE certification program 
 | 
  | 
Attachment C20 | 
  | 
DRAFT liaison to IEEE SCC18 on support for public inputs to NFPA 70 2020 
 | 
  | 
Attachment C21 | 
  | 
DRAFT liaison to NFPA Standards Council on TIA 1301 communications powering circuits 
 | 
  | 
Attachment C22 | 
  | 
DRAFT liaison to ITU-T SG15 regarding IEEE P802.3ca progress 
 | 
  | 
Attachment C23 | 
  | 
DRAFT liaison to OIF regarding IEEE P802.3cd progress 
 | 
  | 
Attachment C24 | 
  | 
DRAFT liaison reply to COBO 
 | 
  | 
Attachment C25 | 
  | 
DRAFT liaison to ITU-T SG15 on YANG progress 
 | 
  | 
Attachment C26 | 
  | 
DRAFT liaison to IEC SC65 JWG10 on single pair Ethernet 
 | 
  | 
Attachment C27 | 
  | 
DRAFT liaison to TIA TR42 on connectors and topologies for single pair applications 
 | 
  | 
Attachment C28 | 
  | 
DRAFT liaison to ISO IEC SC25 WG3 regarding IEEE P802.3cg progress 
 | 
  | 
Attachment C29 | 
  | 
DRAFT liaison to ITU-T SG15 regarding G.698.2 
 | 
  | 
Attachment C30 | 
  | 
DRAFT liaison to OIF on 400ZR Interop Project 
 | 
  | 
Attachment C31 | 
  | 
Liaison to ITU-T SG15 regarding IEEE P802.3bs progress 
 | 
  | 
Attachment C32 | 
  | 
Liaison to OIF regarding IEEE P802.3bs progress 
 | 
  | 
Attachment C33 | 
  | 
Liaison to INCITS T11.2 regarding IEEE P802.3bs progress 
 | 
  | 
Attachment C34 | 
  | 
Liaison to ITU-T SG15 on the ANT workplan 
 | 
  | 
Attachment C35 | 
  | 
Liaison to ITU-T SG15 on the HNT workplan 
 | 
  | 
Attachment C36 | 
  | 
Liaison to ITU-T SG15 on the OTNT workplan 
 | 
  | 
Attachment C37 | 
  | 
Liaison to ISO/IEC JTC 1/SC 6 on China NB comment 
 | 
  | 
Attachment C38 | 
  | 
Liaison to Ethernet Alliance on PoE certification program 
 | 
  | 
Attachment C39 | 
  | 
Liaison to IEEE SCC18 on support for public inputs to NFPA 70 2020 
 | 
  | 
Attachment C40 | 
  | 
Liaison to NFPA Standards Council on TIA 1301 communications powering circuits 
 | 
  | 
Attachment C41 | 
  | 
Liaison to ITU-T SG15 regarding IEEE P802.3ca progress 
 | 
  | 
Attachment C42 | 
  | 
Liaison to OIF regarding IEEE P802.3cd progress 
 | 
  | 
Attachment C43 | 
  | 
Liaison reply to COBO 
 | 
  | 
Attachment C44 | 
  | 
Liaison to ITU-T SG15 on YANG progress 
 | 
  | 
Attachment C45 | 
  | 
Liaison to IEC SC65 JWG10 on single pair Ethernet 
 | 
  | 
Attachment C46 | 
  | 
Liaison to TIA TR42 on connectors and topologies for single pair applications 
 | 
  | 
Attachment C47 | 
  | 
Liaison to ISO IEC SC25 WG3 regarding IEEE P802.3cg progress 
 | 
  | 
Attachment C48 | 
  | 
Liaison to ITU-T SG15 regarding G.698.2 
 | 
  | 
Attachment C49 | 
  | 
Liaison to OIF on 400ZR Interop Project 
 |