| Administrative attachments | 
  | 
Attachment A1 | 
  | 
IEEE 802.3 Opening agenda | 
  | 
  | 
Attachment A2 | 
  | 
IEEE 802.3 Closing agenda | 
  | 
  | 
Attachment A3 | 
  | 
IEEE 802.3 Opening report | 
  | 
  | 
Attachment A4 | 
  | 
IEEE 802.3 Closing report | 
  | 
  | 
Attachment A5 | 
  | 
IEEE 802.3 Meeting attendance procedures |  
  | 
  | 
Attachment A6 | 
  | 
IEEE 802.3 Voters list |  
  | 
  | 
Attachment A7 | 
  | 
IEEE 802.3 Membership list |  
  | 
  | 
Attachment A8 | 
  | 
IEEE 802.3 Potential voter list |  
  | 
  | 
Attachment A9 | 
  | 
IEEE 802.3 Voters in peril |  
  | 
  | 
Attachment A10 | 
  | 
IEEE 802.3 Attendance credit summary, July 2018 to October 2019 |  
  | 
  | 
Attachment A11 | 
  | 
IEEE 802.3 Attendance list Waikoloa Village | 
  | 
  | 
Attachment A12 | 
  | 
 IEEE 802.3 Treasury Report | 
  | 
  | 
Attachment A13 | 
  | 
IEEE 802.3 Future meetings closing report
Sept 2020 offer | 
  | 
  | 
Attachment A14 | 
  | 
IEEE 802.3 PARs Ad Hoc closing report | 
  | 
  | 
| Task Force and Study Group attachments | 
  | 
Attachment B1 | 
  | 
IEEE 802.3 Maintenance opening report | 
  | 
  | 
Attachment B2 | 
  | 
IEEE 802.3 Maintenance closing report | 
  | 
  | 
Attachment B3 | 
  | 
IEEE P802.3ca 25 Gb/s and 50 Gb/s Ethernet Passive Optical Networks Task Force opening report | 
  | 
  | 
Attachment B4 | 
  | 
IEEE P802.3ca 25 Gb/s and 50 Gb/s Ethernet Passive Optical Networks Task Force closing report | 
  | 
  | 
Attachment B5 | 
  | 
IEEE P802.3cg 10 Mb/s Single Pair Ethernet Task Force opening report | 
  | 
  | 
Attachment B6 | 
  | 
IEEE P802.3ch  Multi-Gig Automotive Ethernet PHY Task Force opening report | 
  | 
  | 
Attachment B7 | 
  | 
IEEE P802.3ch Multi-Gig Automotive Ethernet PHY Task Force closing report | 
  | 
  | 
Attachment B8 | 
  | 
IEEE P802.3ck 100 Gb/s, 200 Gb/s, and 400 Gb/s Electrical Interfaces Task Force opening report | 
  | 
  | 
Attachment B9 | 
  | 
IEEE P802.3ck 100 Gb/s, 200 Gb/s, and 400 Gb/s Electrical Interfaces Task Force closing report | 
  | 
  | 
Attachment B10 | 
  | 
IEEE P802.3cm 400 Gb/s over Multimode Fiber Task Force opening report | 
  | 
  | 
Attachment B11 | 
  | 
IEEE P802.3cm 400 Gb/s over Multimode Fiber Task Force closing report | 
  | 
  | 
Attachment B12 | 
  | 
IEEE P802.3cn 50 Gb/s, 200 Gb/s, and 400 Gb/s over greater than 10 km of SMF Task Force opening report | 
  | 
  | 
Attachment B13 | 
  | 
IEEE P802.3cp Bidirectional 10 Gb/s, 25 Gb/s, and 50 Gb/s Optical Access PHYs Task Force opening report | 
  | 
  | 
Attachment B14 | 
  | 
IEEE P802.3cp Bidirectional 10 Gb/s, 25 Gb/s, and 50 Gb/s Optical Access PHYs Task Force closing report | 
  | 
  | 
Attachment B15 | 
  | 
IEEE P802.3cq Power over Ethernet over 2 Pairs (Maintenance #13) Task Force opening report | 
  | 
  | 
Attachment B16 | 
  | 
IEEE P802.3cq Power over Ethernet over 2 Pairs (Maintenance #13) Task Force closing report | 
  | 
  | 
Attachment B17 | 
  | 
IEEE P802.3cr Isolation (Maintenance #14) Task Force opening report | 
  | 
  | 
Attachment B18 | 
  | 
IEEE P802.3cr Isolation (Maintenance #14) Task Force closing report | 
  | 
  | 
Attachment B19 | 
  | 
IEEE P802.3cs Increased-reach Ethernet optical subscriber access (Super-PON) Task Force opening report | 
  | 
  | 
Attachment B20 | 
  | 
IEEE P802.3cs Increased-reach Ethernet optical subscriber access (Super-PON) Task Force closing report | 
  | 
  | 
Attachment B21 | 
  | 
IEEE P802.3ct 100 Gb/s and 400 Gb/s over DWDM systems Task Force opening report | 
  | 
  | 
Attachment B22 | 
  | 
 IEEE P802.3ct 100 Gb/s and 400 Gb/s over DWDM systems Task Force closing report | 
  | 
  | 
Attachment B23 | 
  | 
IEEE P802.3cu 100 Gb/s and 400 Gb/s over SMF at 100 Gb/s per wavelength Task Force opening report | 
  | 
  | 
Attachment B24 | 
  | 
IEEE P802.3cu 100 Gb/s and 400 Gb/s over SMF at 100 Gb/s per wavelength Task Force closing report | 
  | 
  | 
Attachment B25 | 
  | 
IEEE P802.3cv Maintenance #15: Power over Ethernet Task Force opening report | 
  | 
  | 
Attachment B26 | 
  | 
IEEE P802.3cv Maintenance #15: Power over Ethernet Task Force closing report | 
  | 
  | 
Attachment B27 | 
  | 
IEEE 802.3 Greater than 10 Gb/s Automotive Ethernet Electrical PHYs Study Group opening report | 
  | 
  | 
Attachment B28 | 
  | 
IEEE 802.3 Greater than 10 Gb/s Automotive Ethernet Electrical PHYs Study Group closing report | 
  | 
  | 
Attachment B29 | 
  | 
IEEE 802.3 Multi Gigabit Automotive Optical PHY Study Group opening report opening report | 
  | 
  | 
Attachment B30 | 
  | 
IEEE 802.3 Multi Gigabit Automotive Optical PHY Study Group opening report closing report | 
  | 
  | 
Attachment B31 | 
  | 
IEEE 802.3 Improving PTP Timestamping Accuracy Study Group opening report | 
  | 
  | 
Attachment B32 | 
  | 
IEEE 802.3 Improving PTP Timestamping Accuracy Study Group closing report | 
  | 
  | 
Attachment B33 | 
  | 
IEEE 802.3 10SPE Multidrop Enhancements Study Group opening report | 
  | 
  | 
Attachment B34 | 
  | 
IEEE 802.3 10SPE Multidrop Enhancements Study Group closing report | 
  | 
  | 
Attachment B35 | 
  | 
SCC18 ad hoc closing report | 
  | 
  | 
Attachment B36 | 
  | 
Industry Connections New Ethernet Applications opening report | 
  | 
  | 
Attachment B37 | 
  | 
Industry Connections New Ethernet Applications closing report | 
  | 
  | 
Attachment B38 | 
  | 
Call-for-Interest: 100 Gb/s per Wavelength Short Reach PHYs closing report | 
  | 
  | 
Attachment B39 | 
  | 
Call-for-Interest: Hybrid (optical/electrical) automotive Ethernet Links closing report | 
  | 
  | 
| Liaison Attachments (External and Internal) | 
  | 
Attachment C1 | 
  | 
ISO/IEC SC25/WG3 Liaison report to IEEE 802.3 | 
  | 
 
  | 
Attachment C2 | 
  | 
TIA TR-42 Liaison Report to IEEE 802.3 | 
  | 
  | 
Attachment C3 | 
  | 
ISO/IEC JTC 1/SC 25/WG 3 liaison to IEEE 802.3 on ISO/IEC TR 11801-9906 |  
  | 
  | 
  | 
Attachment C4 | 
  | 
ITU-T SG15 to IEEE 802.3 regarding OTNT Standardarization Work Plan
 Attachment (Password protected) | 
  | 
  | 
  | 
Attachment C5 | 
  | 
OIF to IEEE P802.3ck regarding progress on CEI-112G-VSR and CEI-112G-LR projects
 Attachment (Password protected) | 
  | 
  | 
  | 
Attachment C6 | 
  | 
ITU JCA-IMT2020: Invitation to update IMT2020 roadmap |  
  | 
  | 
  | 
Attachment C7 | 
  | 
ITU-T SG15: Coordination of Ethernet information and data modelling
 Attachment (Password protected) | 
  | 
  | 
  | 
Attachment C8 | 
  | 
ITU-T SG15: 100 Gbit/s and 400 Gbit/s DWDM issues |  
  | 
  | 
  | 
Attachment C9 | 
  | 
OIF to IEEE P802.3ct regarding progress on OIF 400ZR project
 Attachment (Password protected)
  | 
  | 
  | 
  | 
Attachment C10 | 
  | 
ISO/IEC JTC 1/SC 25/WG 3 to IEEE 802.3 on remote powering
 Attachment (Password protected)
  | 
  | 
  | 
  | 
Attachment C11 | 
  | 
DRAFT Liaison to ISO/IEC JTC1 SC 6 on the availability of IEEE drafts | 
  | 
  | 
Attachment C12 | 
  | 
DRAFT Liaison to ITU-T SG15 on coordination between P802.3cs Q2/SG15 project G.9807.3 | 
  | 
  | 
Attachment C13 | 
  | 
DRAFT Liaison to ITU-T Study Group 15 concerning P802.3ct status | 
  | 
  | 
Attachment C14 | 
  | 
Liaison to ISO/IEC JTC1 SC 6 on the availability of IEEE drafts | 
  | 
  | 
Attachment C15 | 
  | 
Liaison to ITU-T SG15 on coordination between P802.3cs Q2/SG15 project G.9807.3 | 
  | 
  | 
Attachment C16 | 
  | 
Liaison to ITU-T Study Group 15 concerning P802.3ct status | 
  |