| Administrative attachments | 
  | 
Attachment A1 | 
  | 
IEEE 802.3 Opening agenda | 
  | 
Attachment A2 | 
  | 
IEEE 802.3 Mid-session agenda | 
  | 
Attachment A3 | 
  | 
IEEE 802.3 Closing agenda | 
  | 
Attachment A4 | 
  | 
IEEE 802.3 Opening report | 
  | 
Attachment A5 | 
  | 
IEEE 802.3 Mid-session report | 
  | 
Attachment A6 | 
  | 
IEEE 802.3 Closing report | 
  | 
Attachment A7 | 
  | 
IEEE 802.3 Meeting attendance procedures | 
  | 
Attachment A8 | 
  | 
IEEE 802.3 Voters list | 
  | 
Attachment A9 | 
  | 
IEEE 802.3 Membership list | 
  | 
Attachment A10 | 
  | 
IEEE 802.3 Potential voter list | 
  | 
Attachment A11 | 
  | 
IEEE 802.3 Voters in peril | 
  | 
Attachment A12 | 
  | 
IEEE 802.3 Attendance credit summary, November 2019 to September 2021 | 
  | 
Attachment A13 | 
  | 
IEEE 802.3 Attendance list November 2021 Plenary Teleconference | 
  | 
Attachment A14 | 
  | 
IEEE 802.3 Treasury Report | 
  | 
Attachment A15 | 
  | 
IEEE 802.3 Future meetings closing report
 | 
  | 
Attachment A16 | 
  | 
TIA TR42 Report to IEEE 802.3
 | 
  | 
Attachment A17 | 
  | 
IEEE 802.3 Rules opening report
 | 
  | 
Attachment A18 | 
  | 
IEEE 802.3 Rules closing report
 | 
  | 
Attachment A19 | 
  | 
IEEE 802 LAN/MAN standards committee Milestone Project
 | 
  | 
| Task Force and Study Group attachments | 
  | 
| Opening plenary meeting reports | 
  | 
  | 
Attachment B1 | 
  | 
IEEE 802.3 Maintenance opening report | 
  | 
Attachment B2 | 
  | 
IEEE P802.3cx Improved PTP timestamping accuracy Task Force report | 
  | 
Attachment B3 | 
  | 
IEEE P802.3cy Greater than 10 Gb/s Electrical Automotive Ethernet Task Force report | 
  | 
Attachment B4 | 
  | 
IEEE P802.3cz Multi-Gigabit Optical Automotive Ethernet Task Force report | 
  | 
Attachment B5 | 
  | 
IEEE P802.3db 100 Gb/s, 200 Gb/s, and 400 Gb/s Short Reach Fiber Task Force report | 
  | 
Attachment B6 | 
  | 
IEEE 802.3 Greater than 10 Mb/s Long-Reach Single Pair Ethernet Study Group report | 
  | 
| Mid-session plenary meeting reports | 
  | 
  | 
Attachment B7 | 
  | 
IEEE P802.3ck 100 Gb/s, 200 Gb/s, and 400 Gb/s Electrical Interfaces Task Force opening report | 
  | 
Attachment B8 | 
  | 
IEEE P802.3cs Increased-reach Ethernet optical subscriber access (Super-PON) Task Force opening report | 
  | 
Attachment B9 | 
  | 
IEEE P802.3cw 400 Gb/s over DWDM systems report | 
  | 
Attachment B10 | 
  | 
IEEE P802.3da 10 Mb/s Single Pair Multidrop Segments Enhancement Task Force report | 
  | 
Attachment B11 | 
  | 
IEEE P802.3dd Power over Data Lines of Single Pair Ethernet (Maintenance #17) Task Force report | 
  | 
Attachment B12 | 
  | 
IEEE P802.3de Time Synchronization for Point-to-Point Single Pair Ethernet Task Force opening report | 
  | 
Attachment B13 | 
  | 
IEEE Beyond 400 Gb/s Ethernet Study Group opening report | 
  | 
| Closing plenary meeting reports | 
  | 
  | 
Attachment B14 | 
  | 
IEEE 802.3 Maintenance closing report | 
  | 
Attachment B15 | 
  | 
IEEE P802.3ck 100 Gb/s, 200 Gb/s, and 400 Gb/s Electrical Interfaces Task Force closing report | 
  | 
Attachment B16 | 
  | 
IEEE P802.3cs Increased-reach Ethernet optical subscriber access (Super-PON) Task Force closing report | 
  | 
Attachment B17 | 
  | 
IEEE P802.3dd Power over Data Lines of Single Pair Ethernet (Maintenance #17) Task Force closing report | 
  | 
Attachment B18 | 
  | 
IEEE P802.3de Time Synchronization for Point-to-Point Single Pair Ethernet Task Force closing report | 
  | 
Attachment B19 | 
  | 
IEEE Beyond 400 Gb/s Ethernet Study Group closing report | 
  | 
Attachment B20 | 
  | 
IEEE 802.3 Greater than 10 Mb/s Long-Reach Single Pair Ethernet Study Group closing report | 
  | 
| Liaison Attachments (External and Internal) | 
  | 
Attachment C1 | 
  | 
TIA TR-42 to IEEE 802.3 on the use of test method FOTP-455-54 (FOTP 54) 
 | 
  | 
  | 
Attachment C2 | 
  | 
OIF to IEEE:  400ZR IA Maintenance Project update
 Attachment (Password protected) | 
  | 
  | 
Attachment C3 | 
  | 
OIF to IEEE:  800G Coherent Project Status 
 | 
  | 
Attachment C4 | 
  | 
ITU-T SG15 to IEEE:  Initiation of work on greater than 50G Bidirectional Optics 
 | 
  | 
| Draft Outgoing Liaison Letters | 
  | 
Attachment D1 | 
  | 
Draft:  IEEE 802.3 to TIA TR-42 reply on the use of test method TIA-455-54 (FOTP 54) 
 | 
  | 
  | 
Attachment D2 | 
  | 
Draft:  IEEE 802.3 to IEEE 1588 on the status of P802.3cx 
 | 
  | 
  | 
Attachment D3 | 
  | 
Draft:  IEEE 802.3 to ITU-T SG15 Q13 on the status of P802.3cx 
 | 
  | 
  | 
Attachment D4 | 
  | 
Draft:  IEEE 802.3 to ISO/IEC JTC1/SC25 WG3 as a repy to incoming liaison 3N1300, multidrop cabling 
 | 
  | 
  | 
Attachment D5 | 
  | 
DRAFT: IEEE 802.3 to ITU-T SG15 on the status of P802.3cw 
 | 
  | 
  | 
Attachment D6 | 
  | 
DRAFT: IEEE 802.3 to OIF on the status of P802.3cw 
 | 
  | 
  | 
Attachment D7 | 
  | 
Draft:  IEEE 802.3 to ISO/IEC JTC1/SC25 WG3 as a repy to incoming liaison 3N1299, demating under load 
 | 
  | 
  | 
Attachment D8 | 
  | 
Draft:  IEEE 802.3 to ITU-T SG15 in response to Liaison on HNT standardization work plan 
 | 
  | 
  | 
Attachment D9 | 
  | 
Draft:  IEEE 802.3 to ITU-T SG15 in response to Liaison on ANT standardization work plan 
 | 
  | 
  | 
Attachment D10 | 
  | 
Draft:  IEEE 802.3 to ITU-T SG15 in response to Liaison on OTNT standardization work plan 
 | 
  | 
  | 
Attachment D11 | 
  | 
Draft:  IEEE 802.3 to ISO/IEC JTC 1 SC 6:  reply to China NB comments on ballots 
 | 
  | 
  | 
Attachment D12 | 
  | 
DRAFT: IEEE 802.3 to OIF on the status of P802.3ck 
 | 
  | 
  | 
Attachment D13 | 
  | 
DRAFT: IEEE 802.3 to COBO on the status of P802.3ck 
 | 
  | 
  | 
Attachment D14 | 
  | 
DRAFT: IEEE 802.3 to INCITS T11.2 on the status of P802.3ck 
 | 
  | 
  | 
Attachment D15 | 
  | 
Draft:  IEEE 802.3 to ITU-T SG15 on coordination between the IEEE P802.3cs task force and Q2/SG15 project G.9807.3 
 | 
  | 
  | 
Attachment D16 | 
  | 
Draft:  IEEE 802.3 to ITU-T SG15: reply to Liaison #SG15-LS324 “LS/r on OTN support of Ethernet clients beyond 400 Gb/s” 
 | 
  | 
  | 
Attachment D17 | 
  | 
Draft:  IEEE 802.3 to OIF: reply to Liaison “800G Coherent Project Status” 
 | 
  | 
  | 
| Final Outgoing Liaison Letters | 
  | 
Attachment E1 | 
  | 
IEEE 802.3 to TIA TR-42 reply on the use of test method TIA-455-54 (FOTP 54) 
 | 
  | 
  | 
Attachment E2 | 
  | 
IEEE 802.3 to IEEE 1588 on the status of P802.3cx 
 | 
  | 
  | 
Attachment E3 | 
  | 
IEEE 802.3 to ITU-T SG15 Q13 on the status of P802.3cx 
 | 
  | 
  | 
Attachment E4 | 
  | 
IEEE 802.3 to ISO/IEC JTC1/SC25 WG3 as a repy to incoming liaison 3N1300, multidrop cabling 
 | 
  | 
  | 
Attachment E5 | 
  | 
IEEE 802.3 to ITU-T SG15 on the status of P802.3cw 
 | 
  | 
  | 
Attachment E6 | 
  | 
IEEE 802.3 to OIF on the status of P802.3cw 
 | 
  | 
  | 
Attachment E7 | 
  | 
IEEE 802.3 to ISO/IEC JTC1/SC25 WG3 as a repy to incoming liaison 3N1299, demating under load 
 | 
  | 
  | 
Attachment E8 | 
  | 
IEEE 802.3 to ITU-T SG15 in response to Liaison on HNT standardization work plan 
 | 
  | 
  | 
Attachment E9 | 
  | 
IEEE 802.3 to ITU-T SG15 in response to Liaison on ANT standardization work plan 
 | 
  | 
  | 
Attachment E10 | 
  | 
IEEE 802.3 to ITU-T SG15 in response to Liaison on OTNT standardization work plan 
 | 
  | 
  | 
Attachment E11 | 
  | 
IEEE 802.3 to ISO/IEC JTC 1 SC 6:  reply to China NB comments on ballots 
 | 
  | 
  | 
Attachment E12 | 
  | 
IEEE 802.3 to OIF on the status of P802.3ck 
 | 
  | 
  | 
Attachment E13 | 
  | 
IEEE 802.3 to COBO on the status of P802.3ck 
 | 
  | 
  | 
Attachment E14 | 
  | 
IEEE 802.3 to INCITS T11.2 on the status of P802.3ck 
 | 
  | 
  | 
Attachment E15 | 
  | 
IEEE 802.3 to ITU-T SG15 on coordination between the IEEE P802.3cs task force and Q2/SG15 project G.9807.3 
 | 
  | 
  | 
Attachment E16 | 
  | 
IEEE 802.3 to ITU-T SG15: reply to Liaison #SG15-LS324 “LS/r on OTN support of Ethernet clients beyond 400 Gb/s” 
 | 
  | 
  | 
Attachment E17 | 
  | 
IEEE 802.3 to OIF: reply to Liaison “800G Coherent Project Status” | 
  |