Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Hi Jerry,
On thursday afternoon in Orlando there was a
discussion about the top level schedule and work plan for 802.20. You,
Gang, and Eshwar had a contribution on it (C802.20-04/36) as well as Mark
Klerer, Joanne Wilson, and Steve Dennett (C802.20-04/40r1).
Was there any resolution to these two work
plans. That is, did the group come to a concensus on a work plan? If
so, is that captured anywhere in a document?
Thanks. . .
Hank Eilts
Texas Instruments, Inc.
12500 TI Blvd.
Dallas, TX 75243
Voice: 214.480.358
Fax: 972.761.6966
email: eilts@ti.com
|