Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Re: [802-20-GENERAL:] Meeting Summary Comments from Jan 2006



I had previously sent this previously to Rajat, Jerry, & the reflector.
However, due to email problems with the reflector - it only went to
Jerry & Rajat.  Am resending to the group as an FYI.

==============================================================

Rajat - I noted the meeting summary from the Jan 2006 has been posted to
the IEEE 802.20 web site.  One of my statements which I had requested to
be included in the meeting summary appears to have been substantially
condensed.  Please update the text on page 4 (about 2/3 down the page).
 
Should be:
Alan Jette stated: "The link-system interface was specifically required
in the initial submission for a proposal package - per Evaluation
Criteria (PD-09), section 7 and Technology Selection Process (PD-10),
section 3.2.  Since this data was not initially provided, the the
original QC proposal was incomplete for this reason and it should be
disqualified."


I am very certain of the wording, since I was reading off my PC.  I
probably should have emailed you the exact text.

Thanks
Al Jette