Re: [802-20-GENERAL:] Meeting Summary Comments from Jan 2006
I had previously sent this previously to Rajat, Jerry, & the reflector.
However, due to email problems with the reflector - it only went to
Jerry & Rajat. Am resending to the group as an FYI.
==============================================================
Rajat - I noted the meeting summary from the Jan 2006 has been posted to
the IEEE 802.20 web site. One of my statements which I had requested to
be included in the meeting summary appears to have been substantially
condensed. Please update the text on page 4 (about 2/3 down the page).
Should be:
Alan Jette stated: "The link-system interface was specifically required
in the initial submission for a proposal package - per Evaluation
Criteria (PD-09), section 7 and Technology Selection Process (PD-10),
section 3.2. Since this data was not initially provided, the the
original QC proposal was incomplete for this reason and it should be
disqualified."
I am very certain of the wording, since I was reading off my PC. I
probably should have emailed you the exact text.
Thanks
Al Jette