The January 2009 meeting was held at the Hyatt Century Plaza, Los Angeles, CA, USA.
As of this meeting, the IEEE 802.11 membership consists of xxx voting members.
January 18th-23rd Hyatt Century Plaza , Los Angeles, CA, USA 113 Interim 802.11 WG, TGs, SGs, SC & AHC Combined Agenda includes all Objectives & the WG Graphic 11-08-1450r4 (The combined agenda for this session will be posted 30 days before the session)
Official WG PAR Projects & Timescales
Hotel Booking, Session Registration & General Info
Ballots
These ballots were initiated since the prior meeting:See letter ballots for details.
- Letter Ballot 138 was a recirculation letter ballot for 802.11n-D7.0. It closed December 2nd, 2008.
It passed with 95% approval. (281 approve, 14 disapprove, 20 abstain)- Letter Ballot 139 was a letter ballot for 802.11z-D3.0. It closed December 18th, 2008.
It passed with 84% approval. (155 approve, 29 disapprove, 41 abstain)- Letter Ballot 140 was a letter ballot for 802.11v-D4.0. It closed December 19th, 2008.
It passed with 81% approval. (149 approve, 36 disapprove, 40 abstain)- Letter Ballot 141 was a recirculation letter ballot for 802.11p-D5.0. It closed December 5th, 2008.
It passed with 85% approval. (149 approve, 26 disapprove, 35 abstain)
These new ballots were approved from this meeting:
- 15 day recirculation letter ballot of 802.11u-D5.0
- 15 day recirculation letter ballot of 802.11z-D4.0
Other WG activities:
- The Working Group approved the following output items:
- Liaison letter (doc 11-09-0192r0) to the ISO/IEC JTC1/SC6 Secretariat
- Upcoming Interim meeting locations were discussed:
May 10th-15th, 2009 Montreal, Canada Fairmont The Queen Elizabeth September 20th-25th, 2009 Waikoloa, Big Island, HI, USA Hilton Waikoloa Village January 17th-22nd, 2010 Garden Grove, California, USA Hyatt Regency May 16th-21st, 2010 Beijing, PRC Shangri-La Beijing
Minutes & Reports
The consolidated working group and task group minutes for this meeting are available hereThe reports for the individual task groups are linked below:
Project 802.11m, Maintenance PAR Project 802.11n, High Throughput Project 802.11p, Wireless Access in the Vehicular Environment Project 802.11s, Mesh Networking Project 802.11u, Interworking With External Networks Project 802.11v, Wireless Network Management Project 802.11w, Protected Management Frames Project 802.11y, Contention Based Protocol Project 802.11z, Direct Link Setup Project 802.11aa, Video Transport Streams Project 802.11ac, Very High Throughput <6GHz Project 802.11ad, Very High Throughput 60GHz The reports for the individual standing committees are linked below:
WNG SC, Wireless LAN Next Generation Standing Committee ARC: Architecture Standing Committee The reports for the individual study and ad hoc groups are linked below:
JTC1 AHC, JTC1 Ad Hoc Committee
Meeting Schedule
The next meeting (#114) is at the Hyatt Regency and Fairmont, Vancouver, British Columbia, Canada from March 8th-13th 2009.
See March 2009 meeting for details.
This page is maintained by Stephen McCann. Comments are welcome.Copyright (c) , the Institute of Electrical and Electronics Engineers, Inc. (IEEE).
All rights reserved.This website may contain names, logos, designs, titles, words, or phrases that may
constitute trademarks, service marks, or tradenames of the IEEE or other entities
which may be registered in certain jurisdictions.